Table of contents
ii
M0691622_en | Installation instructions TM 320-550
3.4.1 Connection line to the chimney.................................................................................................. 10
3.4.2 Measuring port ........................................................................................................................... 11
3.4.3 Draught limiter............................................................................................................................ 11
4.3.1 TM 320-400................................................................................................................................ 17
4.3.2 TM 500-550................................................................................................................................ 19
4.3.3 Boiler data for planning the flue gas system .............................................................................. 21
5.5.1 General information ................................................................................................................... 25
5.5.2 Installing the grate drive............................................................................................................. 26
5.5.3 Assembling the stoker unit......................................................................................................... 27
5.5.4 Installing the hydraulic stoker unit (optional).............................................................................. 28
5.5.5 Fitting the burn back slide valve................................................................................................. 28
5.5.6 Bolting together the combustion chamber and heat exchanger................................................. 29
5.5.7 Assembling the case cooling duct (optional).............................................................................. 31
5.5.8 Repositioning the EOS rods (if required) ................................................................................... 33
5.5.9 Fitting various fittings ................................................................................................................ 34
5.5.10 Removing the different blanking plugs....................................................................................... 35
5.5.11 Assembling the insulation floor base frame ............................................................................... 36
5.5.12 Assembling the flange for the heat exchanger ash removal system.......................................... 39
5.5.13 Fitting thermal insulation to the boiler ........................................................................................ 39