![Fröling TM 320-550 Installation Instructions Manual Download Page 24](http://html1.mh-extra.com/html/froling-0/tm-320-550/tm-320-550_installation-instructions-manual_2338786024.webp)
5 | Assembly
24
M0691622_en | Installation instructions TM 320-550
5.4 Setting up in the boiler room
5.4.1 Moving the boiler in the boiler room
r
Position a forklift or similar lifting device with a suitable load-bearing capacity at the
base frame
r
Lift and transport to the intended position in the installation room.
Ä
Pay attention to the operating and maintenance areas of the equipment in the
process!
5.4.2 Operating and maintenance areas of the equipment
▪ The system should generally be set up so that it is accessible from all sides to allow
quick and easy maintenance!
▪ Regional regulations regarding necessary maintenance areas for inspecting the
chimney should be observed in addition to the specified distances!
▪ Observe the applicable standards and regulations when setting up the system!
▪ Comply with additional standards for noise protection!
(ÖNORM H 5190 - Noise protection measures)
A
C
E
B
D
Item
320
400-550
A
1000
1000
B
500
500
C
500
500
D
870
950
E
3100
3300