5 | Assembly
84
M0691622_en | Installation instructions TM 320-550
5.8 Power connection and wiring
DANGER
When working on electrical components:
Risk of electrocution!
When work is carried out on electrical components:
r
Always have work carried out by a qualified electrician
r
Observe the applicable standards and regulations
Ä
Work must not be carried out on electrical components by unauthorised persons
5.8.1 Potential equalisation
r
Remove the cover plates on the bracket of the FGR blower fan and connect the
potential equalisation to the heat exchanger
r
Establish potential equalisation to all boiler components
Ä
Fuel outfeeder, ash removal, induced draught fan, FGR blower fan, flue gas pipe,
pipes, control cabinet etc.
IMPORTANT: The potential equalisation must comply with current directives,
regulations and standards.
5.8.2 Laying of cables
r
Lay the cables from the components through the cable ducts to the control cabinet
NOTICE! Ensure stability of detached control cabinet as well as a dry and stable
ground!
r
Wire the connections according to the wiring diagram.
r
Ensure that there is strain relief for all cables in the control cabinet.
r
Tie any loose hanging cables to the drive motors using cable ties. The cables must not
come into contact with the stoker duct!
CAUTION! Lay the cables from components without risk of stumbling!
NOTICE! To save from damage use cable ducts or conduits for laying!