Installation | 5
M2050222_en | Installation instructions Lambdamat LM 1500 KOM
27
5.6.6 Fitting the immersion sleeves for the thermal discharge valve and undergrate
sensor
r
Seal the immersion sleeves for the thermal discharge valve in top of heat exchanger.
r
Seal the immersion sleeve for the undergrate sensor on the same side of the boiler as
the combustion air fan.
5.6.7 Fitting thermal insulation to the boiler
r
Fit the thermal insulation to the left and right of the boiler, cutting it out at the
connections (A).
Ä
Secure the thermal insulation with tension springs (B).
r
Cut out the thermal insulation at all the necessary places (C) (doors, torque supports,
openings, etc.).