❒ Loosen the cover plate and mount it so that the right opening is closed
❒ Lead out the cable of the geared motor at the middle cut-out and mount the cover
plate
❒ Loosen the torque support on the geared motor, turn it by 180° and re-install it
❒ Insert key into shaft groove
❒ Slide the geared motor onto the shaft and secure it with the shaft retainer
❒ Connect the extension cable to the geared motor
Installing the ash container and fittings on opposite side
❒ Position safety limit switch behind insulation and secure with screws
❒ Install the ash removal flange
➥ Ensure correct positioning of the ash screw!
5
Assembly
Adapting the electrostatic precipitator system (if required)
26
Fröling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com