MCC
–
Cold / Ambient
EU
11/40
3.
INSTALLATION AND FIRST USE
All packing materials used for this unit are suited for recycling
.
Before and during unpacking, check the state of the unit. In case of damage, store the packing
material, and contact the transporter within fifteen working days after receiving the goods.
3.1
Unpacking the unit
1. Unpack the unit as initiated on the unpacking instruction on the packaging.
2. Remove all remaining packing materials from the unit.
3. Remove the protective foil from the metal parts.
4. Take off the standard accessories.
Summary of Contents for 120-2-C FS
Page 37: ...MCC Cold Ambient EU 37 40 Notes...
Page 38: ...MCC Cold Ambient EU 38 40 Notes...