Safety Instructions
Important: Read Before Commissioning
•
The user must ensure that all operators are familiar with this operating manual and follow it at all
times.
•
The operating manual must be read carefully before the instrument is mounted, installed and
commissioned.
•
All actions taken must follow the operating manual.
•
Installation and commissioning may only be carried out by appropriately qualified personnel with
due regard for all rules and regulations that are in force.
•
When the instrument is connected to mains voltage, it must not be opened.
•
If the instrument is visibly damaged, it must not be installed, wired up or commissioned.
•
If the instrument does not work after commissioning, it must be
disconnected
from the mains.
•
Any further laws, standards, guidelines, etc. relevant to this product must be complied with.
Additional information on
EML 1101 Maximum Demand Controller
•
Loads
which may cause damage or danger when disconnected by EML1101 must
not be
connected to the load channels.
•
The responsibility for correct load settings, such that proper operation is guaranteed and no
damage or danger arises, remains 100% with the customer.