background image

Hampton® H15U-NG/LP Direct Vent Freestanding Gas Stove

41

41

installation

operating instructions

Final Check

Before  leaving  this  unit  with  the  customer,  the 
installer  must  ensure  that  the  appliance  is  firing 
correctly. This includes:

1)

  Clocking  the  appliance  to  ensure  the  correct 

firing rate (rate noted on label) at 15 minutes.

2)

  If required, adjusting the primary air to ensure 

that the flame does not carbon. First allow the 
unit to burn for 15 min. to stabilize.

3)

  Check for proper draft.

CAUTION

Any alteration to the product that causes soot-
ing or carboning that results in damage to the 
exterior facia is not the responsibility of the 
manufacturer.

Operating Instructions

1)

  Read and understand these instructions before 

operating this appliance.

2)

  Check to see that all wiring is correct and en-

closed to prevent possible shock.

3)

  Check to ensure there are no gas leaks.

4)

  Make sure the glass in the door frame is properly 

positioned. Never operate the appliance with the 
glass removed. Never strike the glass or slam 
the door shut.

5)

  Verify that the venting and cap are unobstructed.

6)

  Verify log placement. If the pilot cannot be seen 

when lighting the unit, the logs are incorrectly 
positioned.

7)

  The  unit  should  never  be  turned  off,  and  on 

again without a minimum of a 60 second wait.

Shutdown Procedure

1)

  Turn  the  main  gas  control  clockwise  to  the 

"OFF" position to turn off the pilot (push knob 
in slightly).

2)

  Turn off all electric power to appliance if service 

is to be performed. 

First Fire

The 

FIRST FIRE

 in your stove is part of the paint 

curing process. To ensure that the paint is properly 
cured, it is recommended that you burn your fireplace 
for at least four (4) hours the first time you use it with 
the fan on. When first operated, the unit will release 
an odour caused by the curing of the paint and the 
burning off of any oils remaining from manufactur-
ing. Smoke detectors in the house may go off at this 
time. Open a few windows to ventilate the room for 
a couple of hours. The glass may require cleaning.

DO NOT ATTEMPT TO CLEAN THE GLASS WHILE 
IT IS STILL 

HOT

!

Note:  When the glass is cold and the appliance 

is lit, it may cause condensation and fog 

the glass. This condensation is normal 

and will disappear in a few minutes as 

the glass heats up.

DO NOT BURN THE APPLIANCE WITH

-

OUT THE GLASS FRONT IN PLACE.

During the first few fires, a white film may 
develop on the glass front as part of the cur-
ing process. The glass should be cleaned or 
the film will bake on and become very difficult 
to remove. Use a non-abrasive cleaner and 
NEVER clean the glass while it is hot.

 

Lighting Procedure

IMPORTANT: Gas on/off knob cannot be turned 
from "PILOT" to "OFF" unless it is partially 
depressed.

1)

  Turn  stove  OFF  using  the  Burner  "ON/OFF" 

switch  remote or thermostat.

2)

  Turn  gas  control  knob  so  indicator  points  to 

"OFF" position and allow 5 minutes for any gas 
in the combustion chamber to escape.

3)

  Turn  gas  control  knob  counterclockwise  so 

indicator points to the "PILOT" position. Depress 
the gas control knob fully until the pilot lights. 
After approximately one minute, release the gas 
control knob. The pilot flame should continue 
to burn. If the pilot does not remain lit, repeat 
operation  allowing  a  longer  period  before 
releasing gas control knob.

4)

  When the pilot stays lit, turn the gas knob further 

counterclockwise to the "ON" position.

5)

  Use the ON/OFF switch, thermostat or remote 

control to turn on the unit.

6)

  Rotate the flame height regulator to adjust the 

flame height higher or lower.

 

IMPORTANT

To ignite or reignite the pilot, 

the door to the firebox must be 

opened. 

Only when the pilot holds without pressure to the 

control knob should the door to the firebox be 

closed. The unit 

must never

 be operated with the 

glass or door open. 

NOTE: For all propane units and units equipped 
with electric spark boxes, see "Copy of Lighting 
Plate Instructions" section for more details.

 

Summary of Contents for Hampton H15U-LP

Page 1: ...hat to do if you smell gas Do not try to light any appliance Do not touch any electrical switch Do not use any phone in your building Immediately call your gas supplier from a neighbour s phone Follow...

Page 2: ...rking with letters on a contrasting background located adjacent to the controlling device or in an equally conspicuous position where the instruction can be easily read April 22 14 Created draft Doubl...

Page 3: ...the Lighting Plate Instructions 10 Important Message 11 Specifications 11 Mobile Manufactured Homes After First Sale 11 Before You Start 11 General Safety Information 12 Installation Checklist 12 Cle...

Page 4: ...Horizontal Vent 19 3 8 492mm 23 1 8 587mm 20 11 16 525mm 17 1 2 444mm 14 1 4 361mm 13 5 8 345mm 24 1 8 612mm 20 13 16 529mm 18 15 16 481mm ALL PICTURES DIAGRAMS SHOWN THROUGHOUT THIS MANUAL ARE FOR IL...

Page 5: ...irect Vent Freestanding Gas Stove 5 safety label Unit Dimensions with Vertical Vent 19 3 8 492mm 23 1 8 587mm 24 13 16 630mm 20 11 16 525mm 18 3 8 467mm 17 1 2 444mm 15 1 16 383mm 14 1 4 361mm 13 5 8...

Page 6: ...nstruction and Safety Standard Title 24 CFR Part 3280 in the United States or when such a standard is not applicable ANSI NCSBCS A225 1 NFPA 501A Manufactured Home Installations Standard or ANSI A119...

Page 7: ...e directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VEN...

Page 8: ...converted to top or rear vent per manual instructions and the insulation discarded Venting YES NO Are the venting components approved for the unit installed Does the venting configuration comply with...

Page 9: ...as the air shutter on the proper setting after running the unit for 20 minutes If applicable were the surround and trims installed according to the manual Was the operation of the fan lights if instal...

Page 10: ...e allum e manuellement Respectez les instructions ci dessous la lettre B AVANT LA MISE EN MARCHE reniflez tout autour de l appareil pour d celer une odeur de gaz Reniflez au niveau du plancher car cer...

Page 11: ...SA C22 1 in Canada Before You Start Safe installation and operation of this appliance requires common sense however we are required bytheCanadianSafetyStandardsandANSIStand ards to make you aware of t...

Page 12: ...air passageways of the appliance be kept clean and free from excessive lint from carpeting 4 See general construction and assembly in structions The appliance and vent should be enclosedwheninstalledi...

Page 13: ...o Combustibles The clearances listed are MINIMUM distances Measure the clearance to both the appliance and the chimney connector The farthest distance is correct if the two clearances do not coincide...

Page 14: ...training it 4 Remove the Top Control Panel Assembly by removing the three screws 7 Connect the red and black wires from the wire harness to speed controller NOTE Speed control wires should be at the b...

Page 15: ...red to 501 red Secure all the wires using wire holder on the rear panel 16 Slide the Rear Access Panel back into position and secure with 2 screws WARNING Electrical Grounding Instructions This appli...

Page 16: ...mbustion to the outside while the outer pipe draws outside combustion air into the combustion chambertherebyeliminatingtheneedtouseheated room air for combustion and losing warm room air up the chimne...

Page 17: ...of center line extended above meter regulator assembly 36 90cm a J Clearance to service regulator vent outlet 36 90cm K Clearance to non mechanical air supply inlet to building or the combustion air i...

Page 18: ...e Length 7 Galvanized N A N A 4D7A N A N A N A N A Adjustable Length 7 Black N A N A 4D7AB N A N A N A N A Extension Pipe 8 1 2 Galvanized 46DVA 08A N A N A N A N A N A N A Extension Pipe 8 1 2 Black...

Page 19: ...oCap 946 205 Vinyl Siding Shield for Riser Vent Terminal 510 994 Rigid Pipe Adaptor Must use with all rigid piping 946 208 P Vent Guard Optional for Riser Vent Terminal 640 530 P Riser Vent Terminal 9...

Page 20: ...t Vent SelkirkDirect Temp AmeriVent Direct venting and Security Secure Vent systems Use of these systems with the Rigid Pipe adaptor is deemed acceptable and does not affect the Intertek WHI listing o...

Page 21: ...eet with min of 8 feet total vertical and max 8 feet total horizontal Please note min 1 foot between 90o elbows is required With these options maxi mum total pipe length is 30 feet with minimum of 6 f...

Page 22: ...ote min 1 foot be tween90o elbowsisrequired Option H H1 V A 2 Max 2 Min B 3 Max 3 Min C 4 Max 4 Min D 5 Max 5 Min E 6 Max 6 Min With these options max total pipelengthis30feetwithmin of6feettotalverti...

Page 23: ...runs with vertical terminations Maximum two 45o elbows If the vent is ENCLOSED in a chase min size 9 x 9 maintain a 1 1 4 clearance to combustibles May be installed in Manufactured Mobile Homes after...

Page 24: ...the vent is unrestricted Masonry chimneys may take various contours which the flexible liner will accommodate However keep the flexible liner as straight as possible avoid unnecessary bending The Air...

Page 25: ...5o elbow will seat onto both the starter collar and the 90o elbow Crimped section of rigid pipe seats into the 90o elbow Only cut the uncrimped side of pipe Dismantle all pipe sections including vent...

Page 26: ...collar 8 Cut the 4 dia flex liner to the desired size Hint leave an extra 12 to 16 of length this willmakethefinalassemblyeasiertoworkwith 9 Secure the 4 dia flex liner to the 4 adapter with Mill Pac...

Page 27: ...minum Vent 1 946 202 Wall Penetration Heat Shield Wall Thimble 2 pcs 1 640 530 P Riser Vent Terminal 1 640 545 P Decorative Wall Trim Black 1 948 128 Tube Mill Pac Screws 380 946 Horizontal Terminatio...

Page 28: ...insulation Theminimumclearancerequirementsbetween the outer wall of the vent pipe and nearby com bustible surfaces is 1 1 4 inch Be sure to check the vent termination clearance requirements from decks...

Page 29: ...ns section c Snorkel Terminations For installations requiring a vertical rise on the exterior of the building 14 inch and 36 inch tall Snorkel Terminations as shown in Diagram 2 are available as well...

Page 30: ...c Before connecting the vent pipe to the vent termination slide the black decorative wall thimble cover over the vent pipe then slide the Wall Penetration Heat Shield Part 946 202 over the vent pipe...

Page 31: ...ting sys tem it is highly recommended to apply Mill Pac sealant supplied to every inner pipe connection Failure to do so may result in drafting or performance issues not covered under warranty Silicon...

Page 32: ...sleeve on the top side of the Connector Use 3 sheet metal screws to assemble these two parts 6 Push the flex pipe back up into the ceiling sup portbox centertheRetroConnector andattach it to the supp...

Page 33: ...chimney in a convenient location as near as possible to the appliance outlet Cut and frame a hole in the roof for the support The sides of this hole must be vertical with 1 1 4 clearance 2 Place the...

Page 34: ...finished reading manometer turn off the gas valve disconnect the hose and tighten the screw clockwise with a 1 8 flat screwdriver Note Screw should be snug but do not over tighten Aeration Adjustment...

Page 35: ...and lift out Installation of LPG Conversion Kit 4 Turn control knob to the OFF position 5 Remove the Hi Low extension knob by pulling it towards you This will expose the black protection cap Remove t...

Page 36: ...on of the DC Sparker 19 Remove the control panel by unscrewing the 2 screws 21 Plug up the Piezo hole with the plastic bushing 22 Attach the DC sparker generator connector to the valve with a screw 23...

Page 37: ...Center Front Log e Embers f Platinum Embers 946 669 supplied with packaged manual Left Front Log Right Front Log 4 Remove Glass front see instructions in manual 3 Remove Cast Front and set the light a...

Page 38: ...of burner to the other If there is any flame hesitation check that area for any blockage of the burner ports 11 Re install the Glass Front Cast Front and Top 8 Take the embers and place on the burner...

Page 39: ...LC or UL approved may be used Thermostat Wire Table Final Check Before leaving this unit with the customer the installer must ensure that the appliance is firing correctly This includes 1 Clocking the...

Page 40: ...away from sharp edges WARNING Electrical Grounding Instructions This appliance is equipped with a three pronged grounding plug for your protection against shock hazard and should be plugged directly...

Page 41: ...remaining from manufactur ing Smoke detectors in the house may go off at this time Open a few windows to ventilate the room for a couple of hours The glass may require cleaning DONOTATTEMPTTOCLEANTHEG...

Page 42: ...allum e manuellement Respectez les instructions ci dessous la lettre B AVANT LA MISE EN MARCHE reniflez tout autour de l appareil pour d celer une odeur de gaz Reniflez au niveau du plancher car cert...

Page 43: ...e this is normal operation of a gas regulator or valve Unit Body Firebox Different types and thicknesses of steel will expand and contract at different rates resulting in some cracking and ticking sou...

Page 44: ...can cause corrosion of caps pipe and fittings It may be caused by havingexcessivelateralruns toomanyelbows and exterior portions of the system being ex posed to cold weather 4 Inspect joints to verify...

Page 45: ...he burner tray assembly simply reverse these instructions Toremovevalvefromvalveassembly continue 13 Remove two 2 thermopile wires 14 Remove thermocouple with a 9 mm metric wrench 15 Remove pilot nut...

Page 46: ...the list should be checked by a licensed gas service technician during the annual service check Your unit may require more frequent maintenance checks if you notice any changes in how it operates Ope...

Page 47: ...lTimberlineBrown 4 383 237 Top Front Grill Cream 5 384 007 Rear Panel 6 280 033 Control Panel Top Rear 7 920 443 Control Panel Decal Top On Off Fan 8 384 917 Fan Assembly Complete 9 945F SimpsonDurave...

Page 48: ...ng Elbow 90 Degree Forged Valve Outlet End N S 904 606 Fitting Elbow 90 Degree Forged Valve Inlet End N S 904 658 Inlet Flex Line Gas SS Steel 24 inch N S 910 941 4 m m Valve Screw With Red O Ring N S...

Page 49: ...Hampton H15U NG LP Direct Vent Freestanding Gas Stove 49 notes...

Page 50: ...n Control Boards Wiring Switches Blowers Blower Control Module Battery Pack Remote Control Systems 2 Enamel Panels 1 Venting Venting Components 1 All Stainless steel surrounds 1 All Firebox Media Crys...

Page 51: ...wndrafts installation error installation by an unqualified installer incorrect chimney components including but not limited to cap size or type operator error abuse misuse use of improper fuels lack o...

Page 52: ...ide the U S should consult their local provincial or national legal codes for additional terms which may be applicable to this warranty How to Obtain Warranty Service Customers should contact the auth...

Page 53: ...elow in order for us to serve you better Warranty Registration Form or Register online immediately at the above Web Site Warranty Details Serial Number required Purchase Date required mm dd yyyy Produ...

Page 54: ...54 Hampton H15U NG LP Direct Vent Freestanding Gas Stove warranty...

Page 55: ...Hampton H15U NG LP Direct Vent Freestanding Gas Stove 55...

Page 56: ...Dealer Name Address _______________________________________________ ___________________________________________________________________ Installer ______________________________________________________...

Reviews: