background image

FPI FP90 Wood Fireplace

11

INST

ALLA

TION

Ventilated Chase Pan

BEFORE YOU START  

Check your inventory list to be sure you have all the necessary parts supplied in good usable 
condition.  Check for any concealed damage. Check the operation of the combustion air damper. 
When the damper is in the fully closed position, the damper handle should be to the left. When 
damper is in the fully open position, the damper handle must be in the right position.    

INSTALLATION COMPONENTS DIAGRAM

Installation Components

Note:   Insulation does not come in contact 

with Chimney.  Maintain a 2" (51mm) 
clearance.

INSTALLATION

CHIMNEY SYSTEM 
CONSIDERATIONS

Regency’s FP90 Fireplace is to be installed 
with one of the following Chimney Systems 
only.  Chimney systems only 7" (178mm) or 8" 
(203mm) diameter are to be used.  

In Canada

Any of the following ULCS 629 listed chimney 
systems may be used:

1)

 CF Sentinal 

 

2) 

SuperPro 2100+ 

3) 

SuperVent 2100+

4)

 Security S-2100+

5) 

Oliver Macleod

6)

 Dura Plus HTC

7)

 ICC Excel 2100

Note: 8" (203mm) - 7" (178mm) adapter is 
mandatory for installation using 7" (178mm) 
chimney.  Anchor plate must be purchased 
with selected chimney system from Chimney 
Supplier. 

The use of only one of these systems is permitted 
when installing the fi replace. Do not alter or mix 
parts from other systems as this may  cause a 
potential hazard and void Regency’s limited 
warranty.   

 

 

Chimney Height

The total height of your chimney system from the 
top of the fi replace to the chimney cap must not 
exceed 40'(12m), and must also meet minimum 
system height requirements. Please refer to 
the fl ue manufacturer's instructions for specifi c 
details. Refer to Minimum Recommended Flue 
Height section. 

Chase Enclosure

A chase is a vertical box-like structure 
constructed to surround the fi replace and 
chimney.  A ventilated chase cap is highly 
recommended. Refer to fl ue manufacturer's 
instructions for reduced fl ue heights above chase 
terminations. As with all chimney installations, 
avoid overhead obstructions such as trees, 
power lines, etc.  

A chase should be constructed just like any out-
side wall, insulated and vapor barriered.  Please 
check with local building authorities. In a cold 
climate, we recommend the base of the chase 
be insulated between the solid  continuous fl oor 
beneath the fi replace and the chase bottom. If 
used, the value and amount of chase insulation 
in a cold climate installation is optional and not 
required for safety.  Insulation is recommended 
to avoid heat loss. 

Inside

Wall

Rain Cap

Storm Collar

Roof Flashing

Attic Radiation

Shield

Nailing Strip

Outside Fresh

Air Duct

Hearth

Extension

Hearth Safety

Strip

Outside Air

Inlet

Framing

Summary of Contents for FP90

Page 1: ...d by Installer Please complete the details on the back cover and leave this manual with the homeowner Homeowner Please keep these instructions for future reference Regency High Ef ciency EPA Certi ed...

Page 2: ...of trouble free enjoyment This product has been certi ed by the Environmental Protection Agency of the United States This means that it meets the strictest standards in providing you with the latest...

Page 3: ...n self Supporting Thin Veneer Facades Installation 17 Masonry Retainer Kit Option 18 Finishing Details 19 Completing The Mantle 19 Masonry Liner Bricks 20 Secondary Air Tube Installation 20 Glass Inst...

Page 4: ...each Regency Fireplace It is located inside the lower louver opening on the left side We have printed a copy of the contents here for your review SAFETY LABEL NOTE Regency units are constantly being i...

Page 5: ...eight 570 lbs 259kg Options Ashdrawer R90 EX90 Fan R90 EX90 Surround Black EX90 Surround Polished Gold EX90 Surround Antique Nickel EX90 Louver Flush Black R90 Louver Flush Black Gold R90 Louver Flush...

Page 6: ...PLEASE RETAIN THIS MANUAL FOR FUTURE REFERENCE IMPORTANT Please read and follow these rules for safety 1 Before starting your replace installation read these installation instructions carefully to be...

Page 7: ...s replace system is designed for installation in accordance with the National Fire Protection Standard for chimneys replaces and solid fuel burningappliances NFPA211andin accordance with codes such as...

Page 8: ...he front and facing of the replace and nearby walls WARNING If insulation is used do not place the unit against it Insulation or vapor barriers if used must be secured to assure insulation and vapor b...

Page 9: ...the front of the unit supporting the header The enclosure walls can be framed using any suitable material 2x4 2x6 studs plywood gyproc etc Normally framing will be set back to allow Non Combustible Ma...

Page 10: ...ed to elevate the replace above the oor a Z type safety strip should be fabricated from 20 gauge galvanized sheet steel and used to protect the front surface of the wood support as well as the oor ben...

Page 11: ...ed when installing the replace Do not alter or mix parts from other systems as this may cause a potential hazard and void Regency s limited warranty Chimney Height Thetotalheightofyourchimneysystemfro...

Page 12: ...E MIN 10 254mm 84 2134mm CEILING NOTES 1 CHASE MUST BE 60 1524mm WIDE INSIDE AND UNIT TO BE CENTERED IN OPENING 2 MANTEL MIN HEIGHT OF 18 457mm FROM TOP OF LOUVER OPENING TO UNDERNEATH MANTEL or 55 1...

Page 13: ...required at each oor penetration See Table 1 page 15 Check chimney manufacturer s framing opening sizes to allow for correct clearances All parts must be listed 4 Theroof ashingshouldbeinstalledmaking...

Page 14: ...e House When there is no re in your unit there still should be suf cient draft to draw smoke from a burning piece of paper held under the baf e If your installation is correct smoke will go up the ue...

Page 15: ...Floor into Attic CF Sentinal Intermediate Joist Shield Attic Insulation Shield Super Pro 2100 Attic Insulation Shield Attic Insulation Shield Super Vent 2100 Attic Insulation Shield Attic Insulation...

Page 16: ...louver opening is blocked off and ex vent is connected to the vent holes in the top of the unit and run to discharge vent grilles Both 8 203mm diameter insulated Flex vents must be used along with one...

Page 17: ...les used for fastening mesh penetrate studs at least 1 25mm 4 Mortar must be thin set or thin bed type inherentlypolymermodi ed Ifnotmodi ed you should add a synthetic latex additive Mix to a rm moist...

Page 18: ...me Check dimen sionsfromopeningandmarkanddrillscrew holes Dependingontheinstallation heavier reinforcing wire screen may be required to bridge the stand off spacer area around the perimeter of the uni...

Page 19: ...hers and screw top mesh C to top of grill frame This is attached with the top edge of the grill frame on piece B 10 Now fasten mesh to wall sheathing and blend in 11 Use only non combustible masonry p...

Page 20: ...facing the right hand side of the rebox 2 Slide the air tube back towards the right side until it locks into place To lock into position use a pair of vise grips and tap them with a mallet until the t...

Page 21: ...de the rebox and one on the underside of the rebox by removing the two nuts and bolts holding the 2 plates together from underneath the stove 4 Push the ash plug into the hole inside the rebox and rep...

Page 22: ...nting Bracket located on the front of the fan transfer tray and secure with the 8 x 3 8 screw provided refer to Diagram 1 5 Install the wiring as shown on the wiring diagram Use the strength relief fo...

Page 23: ...ARE ON THE SLOTTED HOLES ON RIGHT SIDE ONLY 43 000 1092mm 39 250 997mm ONCE THE TEMPLATE IS MOUNTED CHECK TO MAKE SURE THE SIDES ARE PLUMB AND 43 1092mm IN WIDTH NOTE THE TOP IS ANGLED BACK AT 5 DEGR...

Page 24: ...D INSTALL THE SURROUND TEMPLATE ONTO THE UNIT WARNING KEEP MASONRY MATERIAL AT LEAST 1 2 13mm FROM THIS TOP FACING GUIDE THIS IS REQUIRED TO PREVENT MASONRY FACING MATERIAL FROM HITTING THE TOP STIFFE...

Page 25: ...lled correctly according to the specification in the manual The nailing strips must be attached to the top and sides of the unit They must be positioned so that they are set back 13 mm from the face o...

Page 26: ...p trim Center it and attach it to the top nailing strip with self drilling screws 8 It is recommended that the joints of the sheathing run horizontal from the top corners of the unit rather than verti...

Page 27: ...w driver to let the screws for the handle through 2 Fasten the handles to the screen using the fasteners provided INSTALLING THE SCREEN ON THE FIREPLACE 1 Ensure doors are opened enough to allow fire...

Page 28: ...ont of the fireplace and slide the louver down onto the screws Installing the Bottom Louver 3 Closethebottomlouverandsecureonthemagnetsprovided refer to Diagrams 1 and 2 1 Fasten the bottom louver fra...

Page 29: ...he fireplace the facing guide must be installed 3 Attach the sides of the top louver opening adapter to the left and right facing guides with two 2 screws 8 x Optional 4 Install the optional masonry c...

Page 30: ...move the handles by removing the nut and screw Install the new handles by placing them in position over the holes on the surround louver Put the screws through the holes and secure them by tightening...

Page 31: ...e of local codes withthecurrentCanadianorNational Gas Codes CAN1 B149 or ANSI Z223 1 Installation Codes 2 The appliance when installed must be electrically grounded in accordance with local codes or i...

Page 32: ...er Round Duct collar over hole and attach to the tabs using 3 screws B All Models 1 Determinethe locationoftheairregister fan housing assembly Cut a 5 x 16 121mm x 406mm hole between framing members w...

Page 33: ...run Oval duct components are not supplied but can be purchased from an HVAC supplier OPERATION 1 Start the replace as per instructions and allow it to warm up 2 Turn the Wall Rheostat ON and adjust t...

Page 34: ...ative pressure in the house allowing smoke to back into the home The preferred source of combustion air is from outside the building Ifpossible installthekitonthewind loading side of the building not...

Page 35: ...y air tube and baf es b Removetheterminationcapbyremoving the screws and lifting c Make sure replace doors are shut to prevent soot and dirt from entering the loom d Clean chimney with either nylon or...

Page 36: ...wer Complete Shelf Ash Drawer Ash Drawer Ash Drawer Lid 942 110 Ash Plug 820 375 Ash Hole Cover Plate Retainer Plate 9 948 326 Intake Pipe 6 948 327 Intake Pipe Insulation 948 416 6 Outside Air Kit Pa...

Page 37: ...44 39 41 43 42 Brick Liner Bottom Left Vermiculite Liner Left Side Vermiculite Liner Right Side Brick Liner Back Left Brick Liner Back Right Vermiculite Liner Bottom Baffle Firebox Top Left and Right...

Page 38: ...____________ ___________________________________________________ ___________________________________________________ ___________________________________________________ _______________________________...

Page 39: ...s of workmanship from unauthorized service persons or dealers At all times FPI reserves the right to inspect product in the field which is claimed to be defective All claims must be submitted to FPI b...

Page 40: ..._______________________________________ Printed in Canada Regency replace products are designed with reliability and simplicity in mind In addition our internal Quality Assurance Team carefully inspec...

Reviews: