6. Transport the bushing segment by using the ringbolt.
Place the segment one by one in the Solid Body
Elevator.
7. Fix and secure the Bushing Assembly when all
segments are in place.
8. Place the load shoulder of the RRT on top of the
Bushing Assembly. The SBE is now ready for operation.
Removal Procedure
1. Perform Step 8 to 5 in reversed order.
Fig. 25: Step IV
Fig. 26: Step V
Fig. 27: Step VI
Operation Maintenance Manual
07-2018
PN 691250-Z-BC-D - Revision: 04
Solid Body Elevator
23
O
PE
R
A
TION