26
4.6.4
Connecting with USB
Use the included USB cable for connecting a computer directly to the machine.
To connect with USB:
1. Plug one end of the USB cable into the USB port on the back of the unit.
2. Connect the other end of the USB cable to a computer’s USB port.
4.7
Updating firmware
Formlabs regularly releases updated firmware to fix bugs and improve functionality. Download
the latest firmware version for your Formlabs device with PreForm, then upload and install the
firmware file on the machine. Review the
firmware downloads and release notes
about the improvements that come with each version’s release.
To update the firmware via PreForm:
1. Open PreForm.
2. Connect the machine to the computer via USB or connect the device to an Ethernet network.
3. Click the < button. The
Job Info
dialog box opens.
4. Click the machine’s serial name. The
Job Setup
window opens.
5. Click the
Select Sift
arrow. The
Sift List
window opens.
6. Click the machine’s serial name. The
Sift Details
window opens.
7. Click
Update
in the upper-right corner of the
Sift Details
window. The
Firmware Update
window opens.
8. Follow the on-screen instructions to download the latest firmware and then upload the file
to the machine. To upload firmware, the device must be connected to the computer via
USB or the machine must be connected to an Ethernet network.
9. The machine may automatically recognize that you have sent a firmware update. Tap
Continue
on the touchscreen to finish the installation.
10. If you are not prompted to
Continue
, continue the firmware update manually. Tap
Settings
> System > Firmware Update
.
11. After the firmware update installs, confirm the system restart on the touchscreen or wait 30
seconds for an automatic restart.
4.8
Transporting the machine
For detailed guidance and visual assistance, visit
support.formlabs.com
.
Refer to section
4.3.1 Receiving
for product weight and dimensions. Keep the packaging for
transportation or shipping.
The complete packaging kit consists of:
•
one (1) pallet, wood and foam
•
one (1) inner C-fold, cardboard
•
four (4) tie down brackets, steel
•
one (1) outer C-fold, cardboard
•
twelve (12) M6 × 45 mm lag bolts
•
one (1) topper, cardboard
•
one (1) protective bag, plastic
•
two (2) lifting straps
4.8.1
Preparing for transportation
Before repackaging, vacuum the workspace and empty the hoppers. Remove the powder
cartridge, parts bin, surface grate, tool shelf, build chamber, power catch, and all tools.