03-018-97
Engine,
4.6L (2V)
03-01 8-97
DISASSEMBLY AND ASSEMBLY (Continued)
46. Install water pump pulley and tighten bolts to
2Q-30 N-m ( 15-22 lb-ft).
47. Install generator and tighten generator-to-cylinder
block retaining bolts to 2Q-30 N·m ( 1 5-22 lb-ft).
48. Install generator mounting bracket and tighten to
8-1 2 N·m (7 1-106 1b-in).
Fuel Charging Wiring
P
art
Item
Number
Description
1
-
To 12A581 Harness (Part of
90930)
2
90930
Fuel Charging Wiring
3
-
To RH H02S (Part of 90930)
4
-
To EGR Backpressure
Transducer (Part of 90930)
(Continued)
49. Install positive crankcase ventilation valve and
front vapor hose.
50. Install flywheel to crankshaft and tighten six bolts
to 73-87 N-m (56-64 1b-ft).
5 1 . Install fuel charging wiring and connect all
applicable wiring connectors.
A24308-A
Part
Item
Number
Description
5
-
To LH H02S (Part of 90930)
6
-
To Fuel Injectors (8 Places,
Part of 90930)
7
-
To 1 4290 Harness (Part of
90930)
(Continued)
1997 Thunderbird. Cougar July 1 996