8.
COMPONENT REPLACEMENT
Note: any servicing activity must be carried out by qualified personnel only.
Before replacing any boiler component, be sure the boiler is isolated from electric supply and the gas cock is closed. Always ensure that the
boiler is cool.
After replacing any gas carrying components, or opening any gas connections, always check for gas tightness.
After servicing, check the operation of the boiler and restore all boiler controls to their original settings.
8.1.
Electrode (fig. 28)
• Open the sealed chamber and the control panel as described in 7.2
• Disconnect the lead from the electronic board, noting its position
• Unscrew the two screws holding the electrode to the combustion chamber front panel and withdraw the electrode with care
• Reassemble in reverse order
Summary of Contents for Antea 24kW Range
Page 39: ...39 A fig 21...
Page 51: ...51 1 2 31 32 33 34 fig 31 9 Spare part list...
Page 56: ...56...
Page 57: ...57...
Page 58: ...58 Affix your analyser print out here...
Page 59: ...59...