![FOM INDUSTRIE BLITZ Use And Maintenance Manual Download Page 81](http://html.mh-extra.com/html/fom-industrie/blitz/blitz_use-and-maintenance-manual_2315200081.webp)
75
BLITZ
G B
G B
G B
G B
G B
10-15
10.8 FITTING A NEW HORIZONTAL VICE CYLINDER
1
)
Turn the pneumatic master switch to
“0”
and padlock it, then turn the main switch to
“0”.
2
)
Remove the vice pad.
3
)
Undo the release handle
“A” - Fig. 10-14
and remove the cylinder.
4
)
Disconnect the air tubes
“B” - Fig. 10-14
.
5
)
Fit the pad to the new cylinder, replacing it with a new one if necessary.
6
)
Position the new cylinder inside its housing, securing it with the release handle
“A”
.
7
)
Connect the air tubes
“B”
to the union on the new cylinder.
8
)
Release the pneumatic master switch and turn it to
“I”
then turn the main switch to
“I”
.
9
)
Carry out a few test runs.
10-14
B
A
Summary of Contents for BLITZ
Page 2: ...GB GB GB GB GB 1 92 ...
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 24: ...18 GB GB GB GB GB BLITZ 04 04 04 03 04 05 ...
Page 35: ...29 BLITZ GB GB GB GB GB 05 15 05 14 ...
Page 36: ...30 GB GB GB GB GB BLITZ 05 16 05 17 ...
Page 58: ...52 GB GB GB GB GB BLITZ 45 INT 45 INT 09 15 90 492mm 09 16 45 INT 685 mm ...
Page 76: ...70 GB GB GB GB GB BLITZ 10 07 F 10 06 C D E ...
Page 86: ...80 GB GB GB GB GB BLITZ 10 20 B1 B C1 C2 B1 B 10 21 D1 D D2 D ...
Page 88: ...82 GB GB GB GB GB BLITZ 10 23 B A C D ...
Page 89: ...83 BLITZ GB GB GB GB GB 10 24 E E1 F F1 10 25 E E1 F ...
Page 90: ...84 GB GB GB GB GB BLITZ 10 26 10 27 G ...
Page 99: ......
Page 100: ......
Page 101: ......
Page 102: ......
Page 145: ...3 A B C ...
Page 147: ...5 Fig 1 Fig 2 Fig 3 ...
Page 148: ...6 Fig 4 Fig 5 ...
Page 150: ...8 Fig 6 Fig 7 ...
Page 151: ......