&811,1*+$0
Shackle the cunningham blocks into the grommet of the mainsail tack. Take the cunningham line and
feed as follows : (NB : the line must go through the inside of the rotation arm)
-
Start from the cunningham block ont the left side of the mast. Feed the rope into the cleat around the
sheave
-
push the cord up through the first sheave of the left block from back to front
-
take the rope back down, thread it through the left sheave at the base of the mast from front to back
-
take it up through the second sheave of the left block from back to front
-
take it back down and through the single block,
-
take it back up into the first sheave of the right hand block from front to back
-
take it back down through the sheave at the right of the mast base from back to front
-
take it up through the second sheave in the right block from front to back
-
finally thread the line through the cunningham block and in the cleat.
Attach each end of the cunningham line to the shrouds.
Take the righting line from the rope bag. Attach it to the dolphin striker post under the front crossbar
(photo). Pass it under the trampoline through the grommet at the base of the mast. Fold up the end of
the line and stow it in the trampoline pocket at the base of the mast.
Fogh Marine | 416 251-0384 | www.foghmarine.com | [email protected]