IMPORTANT N
NOTES
This fire is an Inset Live Fuel Effect Gas Fire providing radiant warmth. It is designed to operate on Natural Gas
only. See Data Plate on appliance.
It is the LAW that all gas appliances and fittings are installed by a competent person (such as a CORGI registered
fitter) and in accordance with the Gas Safety (Installation and Use) Regulations 1998, the relevant British
Standards for Installation, Codes of Practice and in accordance with the Manufacturers’ Instructions. The
installation shall also be carried out in accordance with the following regulations:
The Building Regulations issued by the Department of the Environment, the Building Standards (Scotland)
(Consolidation) Regulations issued by the Scottish Development Department.
BS 5871 part 2
BS 5440 part 1
BS 8303
BS 1251
BS 6891
BS 6461 part 1
Failure tto ccomply w
with tthesse rreggulationss ccould llead tto pprosseccution aand ddeem tthe w
warranty iinvalid.
Thiss aappliancce m
musst bbe iinsstalled iin aaccccordancce w
with tthe rruless iin fforcce aand uussed oonly iin aa ssufficciently vventilated
sspacce. C
Conssult aall iinsstrucctionss bbefore iinsstallation aand uusse oof tthiss aappliancce. TThiss aappliancce iiss iintended ffor ddecco-
rative ppurpossess.
Thiss aappliancce iiss ffree ffrom aany aassbesstoss m
material. RRefracctoriess aand ccoal bbed aare cconsstruccted ffrom cceramicc ffibre.
Note :: RRemote ccontrol m
modelss oonly - This appliance features a battery-opearated remote control system, and
under normal usage will need new batteries approximately every twelve months.
Remote control Handset requirements - 1 x ‘PP3’ type (9 volt)
Reciever/motor unit requirements - 4 x ‘AA’ type (1.5 volt)
Refer to the appropriate section of these instructions for details of how to change the batteries.
1
Secction
1.0
2.0
3.0
4.0
5.0
6.0
7.0
7.1
8.0
9.0
Contentss
Important Notes
Appliance Data
Installation Requirements
Site Requirements
Ventilation
Flue Boxes
Unpacking the Appliance
Component Checklist
Preparing the Appliance
Preparing the Opening
Pagge N
No.
1
2
2
2
4
4
5
5
5
6
Secction
10.0
11.0
11.1
11.2
12.0
12.1
13.0
14.0
14.1
14.2
15.0
16.0
Contentss
Gas Supply
Fitting the Firebox
Cable Fixing
Gas Connection
Fuel Bed Layout (coal versions)
Fuel Bed Layout (pebble versions)
Fitting Fireframe and Front
Testing & Commissioning
Operating the fire (manual versions)
Operating the fire (remote versions)
Servicing
Troubleshooting Guide
Pagge N
No.
6
7
7
8
8
10
11
11
12
12
14
16
Note - FFor RRepublicc oof IIreland, rreferencce
sshould bbe m
made tto tthe rrelevant sstandardss
ggoverningg iinsstallation, pparticcularly iin rreggard
to fflue ssizingg aand vventilation. SSee IIS813,
ICP3, IIS3277 aand aany oother rruless iin fforcce.
1.0