
Pan
Tilt System
Users Manual, Rev. 1.0, May 2020
34
4.5 Housing Closing
After installation and wiring, close the housing again. Check that the gasket of the housing is present and in good
condition. Pay attention to the fixing, the tightening torque is 6 Nm (53.1 lbf in).
Figure 4-5: Closing the Housing
Ethernet cable
from camera to
J18 connector
Power supply cable
from camera to
J14 connector
Summary of Contents for Pan Tilt System
Page 5: ......
Page 21: ...Technical Data Dimensions 21 2 2 4 Dimensions Figure 2 2 Dimensions ...
Page 32: ...Pan Tilt System Users Manual Rev 1 0 May 2020 32 Fully assembled camera ...
Page 41: ...Pan Tilt Head Installation Fixing 41 5 Figure 5 10 Fixing of Upper Body and Base ...
Page 56: ...Pan Tilt System Users Manual Rev 1 0 May 2020 56 ...