Perfomance Testing and Calibration
Performance Tests
4
4-7
Diode Test
4-7.
Rotate the GMM selector to Diode Test (
ä
). Connect the GMM and 5700A in
Configuration 2 (Figure 4-2,
ä
selected). Then perform the three steps called for in
Table 4-4.
Before proceeding to the next test, place the 5700A in Standby.
Table 4-4. Diode Test Performance Test
Step
GMM Range
Input
Input Source
Lower Limit
Upper Limit
1
Auto
2.9V
5700A
2.3
3.5
2
-2.9V
5700A
-2.3
-3.5
3
Manual
2.5000V
5700A
2.4986
2.5015
Summary of Contents for 863
Page 49: ...Maintenance Disassembly 3 3 5 OFF 1 6 Places 4 5 5 3 3 2 os5f eps Figure 3 1 Disassembly ...
Page 50: ...867B 863 Service Manual 3 6 os6f eps Figure 3 1 Disassembly cont ...
Page 52: ...867B 863 Service Manual 3 8 5 1 6 2 3 4 os30f eps Figure 3 2 Reassembly ...
Page 96: ...6 1 Chapter 6 Schematic Diagrams Title Page 6 1 A1 Main PCA Assembly 6 3 ...
Page 98: ...867B 863 Service Manual 6 4 FLUKE 867 1001 Sheet 2 of 5 Figure 6 1 A1 Main PCA cont ...
Page 99: ...Schematic Diagrams 6 6 5 FLUKE 867 1001 Sheet 3 of 5 Figure 6 1 A1 Main PCA cont ...
Page 100: ...867B 863 Service Manual 6 6 FLUKE 867 1001 Sheet 4 of 5 Figure 6 1 A1 Main PCA cont ...
Page 101: ...Schematic Diagrams 6 6 7 FLUKE 867 1001 Sheet 5 of 5 Figure 6 1 A1 Main PCA cont ...