5500A
Service Manual
6-84
Calibrator Mainframe display indicates that the next steps calibrate pulse width.
Press the OPTIONS, then STORE CONSTS blue softkeys to store the new
calibration constants.
6-111. Verification
All of the Oscilloscope Calibration functions should be verified at least once per year, or
each time the SC300 is calibrated. The verification procedures in this section provide
traceable results; however the factory uses different procedures and instruments of
higher precision than those described here. The procedures in this manual have been
developed to provide users the ability to verify the SC300 at their own site if they are
required to do so. Fluke strongly recommends that, if possible, you return your unit to
Fluke for calibration and verification.
All equipment specified for SC300 verification must be calibrated, certified traceable if
traceability is to be maintained, and operating within their normal specified operating
environment. It is also important to ensure that the equipment has had sufficient time to
warm up prior to its use. Refer to each equipment’s operating manual for details.
Before you begin verification, you may wish to review all of the procedures in advance
to ensure you have the resources to complete them.
6-112. DC Voltage Verification
This procedure uses the following equipment:
•
Hewlett-Packard 3458A Digital Multimeter
•
BNC(f) to Double Banana adapter
•
50
Ω
feedthrough termination (as required)
•
BNC cable supplied with the SC300
For DC voltage verification, refer to Figure 6-19 for the proper setup connections.
Set the Calibrator Mainframe to SCOPE mode, with the Volt menu on the display. Then
use the next sections to verify the DC Voltage function.
6-113. Verification at 1 M
Ω
For the 1 M
Ω
verification, connect the Calibrator Mainframe’s SCOPE connector to the
HP 3458A input, using the cable and the BNC(f) to Double Banana adapter.
Make sure the Calibrator Mainframe impedance is set to 1 M
Ω
(The blue softkey under
Output Z toggles the impedance between 50
Ω
and 1 M
Ω
).
1.
Set the HP 3458A to DCV, Auto Range, NPLC = 10, FIXEDZ = on.
2.
Program the Calibrator Mainframe to output the voltage listed in Table 6-49. Press
O
on the Calibrator Mainframe to activate the output.
3.
Allow the HP 3458A reading to stabilize, then record the HP 3458A reading for each
voltage in Table 6-49.
4.
Compare result to the tolerance column.
6-114. Verification at 50
Ω
For the 50
Ω
verification, connect the SCOPE connector to the HP 3458A input, using
the cable and the 50
Ω
termination connected to the BNC to Banana Plug adapter.
Summary of Contents for 5500A
Page 12: ...5500A Service Manual x...
Page 16: ...5500A Service Manual 1 2...
Page 46: ...5500A Service Manual 1 32...
Page 48: ...5500A Service Manual 2 2...
Page 98: ...5500A Service Manual 4 2...
Page 102: ...5500A Service Manual 4 6 om017f eps Figure 4 2 Exploded View of Front Panel Assemblies...
Page 116: ...5500A Service Manual 5 2...
Page 128: ...5500A Service Manual 6 2...
Page 254: ......
Page 255: ......
Page 256: ......
Page 257: ......
Page 258: ......
Page 259: ......
Page 260: ......
Page 261: ......
Page 262: ......
Page 263: ......
Page 264: ......
Page 265: ......
Page 266: ......
Page 267: ......
Page 268: ......
Page 269: ......
Page 270: ......
Page 271: ......
Page 272: ......
Page 273: ......
Page 274: ......
Page 275: ......
Page 276: ......
Page 277: ......
Page 278: ......
Page 279: ......
Page 280: ......
Page 281: ......
Page 282: ......
Page 283: ......
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ...DS2E SL2 DC5V RELAY...
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......