Controller Maintenance
Controller Part Replacement
4
4-25
6.
Install the anti-vibration device.
7.
Slide the upper communications box (
) into the top of the control panel (
).
8.
Install the two flanges (
) that secure the lower communications box (
) to the
chassis. To do this, install the four screws and washers (
and
) on each flange
(
).
9.
Use the instructions in “Chassis and Control Panel” on page 4-9 to install the control
panel and put the chassis back into the case.
1
4
7
5
6
3
2
Anti-Vibration
Device
Ribbon Cable
Control panel shown seperated to help visualize the procedure.
Seperation not required for this procedure.
hbx072.eps
Figure 4-12. Communications Box Replacement
Summary of Contents for 4322-SYS-NAVAIR
Page 1: ...4322 SYS NAVAIR Automated Pressure Calibrator Service Manual...
Page 10: ...4322 Service Manual vi...
Page 14: ...4322 Service Manual 1 2...
Page 22: ...4322 Service Manual 1 10...
Page 24: ...4322 Service Manual 2 2...
Page 30: ...4322 Service Manual 2 8 hbx064 eps Figure 2 2 Pressure Valve Schematic...
Page 42: ...4322 Service Manual 2 20...
Page 44: ...4322 Service Manual 3 2...
Page 54: ...4322 Service Manual 4 2...
Page 94: ...4322 Service Manual 4 42...
Page 96: ......
Page 106: ...4322 Service Manual 5 12 1 2 3 hbx008 eps Figure 5 2 Intensifier Case Removal...
Page 132: ...4322 Service Manual 6 2...
Page 138: ...4322 Service Manual 7 2...
Page 170: ...4322 Service Manual 7 34...
Page 172: ...4322 Service Manual 8 2...
Page 180: ...4322 Service Manual 9 2...
Page 186: ...4322 Service Manual 9 8...