
4322
Service Manual
2-14
Waste
Pressure Vented
Fine Up Control Valve = CLOSED
Pressure Applied
Fine Up Control Valve = OPEN
Waste
Fine Coalescing Filter
To UUT
Coarse Coalescing Filter
Fine Coalescing Filter
Coarse Coalescing Filter
Particles
Fine Down Control Valve = CLOSED
Fine Down Control Valve = CLOSED
Pressure in from CPS Dock
gxj020.eps
Figure 2-5. CPS Pressure Routing (Cross-Section View)
Summary of Contents for 4322-SYS-NAVAIR
Page 1: ...4322 SYS NAVAIR Automated Pressure Calibrator Service Manual...
Page 10: ...4322 Service Manual vi...
Page 14: ...4322 Service Manual 1 2...
Page 22: ...4322 Service Manual 1 10...
Page 24: ...4322 Service Manual 2 2...
Page 30: ...4322 Service Manual 2 8 hbx064 eps Figure 2 2 Pressure Valve Schematic...
Page 42: ...4322 Service Manual 2 20...
Page 44: ...4322 Service Manual 3 2...
Page 54: ...4322 Service Manual 4 2...
Page 94: ...4322 Service Manual 4 42...
Page 96: ......
Page 106: ...4322 Service Manual 5 12 1 2 3 hbx008 eps Figure 5 2 Intensifier Case Removal...
Page 132: ...4322 Service Manual 6 2...
Page 138: ...4322 Service Manual 7 2...
Page 170: ...4322 Service Manual 7 34...
Page 172: ...4322 Service Manual 8 2...
Page 180: ...4322 Service Manual 9 2...
Page 186: ...4322 Service Manual 9 8...