Contents
Safety Information
4
Mixer Warning Labels
5
Safety Notice Information
Introduction
6 Product
Descriptions
7 Equipment
Maintenance
Log
8
Spare Parts Order
Unpacking Directions
9
Inspect the Crate for Damage
9
Unpacking and Setup
Electrical Conditions
10 Grounding
10 Danger
Aligning and Leveling Mixer
11 Aligning the Struts
11 Leveling
12 Remove Shipping Inserts
Getting to Know Your Paint Mixer
13 General Locations
14 Control Panel
14 Revisable
Door
Important Information
15 Warnings
15 Cautions
Basic Operation
16 Basic Operation Procedure
Operational Test
19 Operational Test Procedure
Maintenance Procedures
20 General Lubrication
21 Super-Struts
Lubrication
Troubleshooting
22 Troubleshooting
Tables
Servicing and Repair
26 General Information
26 Safety Procedure
Opening Mixer
27 Remove the Exterior Panels
F
Fllu
uiid
d M
Ma
an
na
ag
ge
em
me
en
ntt C
Cu
us
stto
om
me
err S
Se
errv
viic
ce
e 1
1..8
80
00
0..4
46
62
2..2
24
46
66
6
Removing Shake Frame
28 Removing Shake Frame Procedure
30 Remove the Counterweights
Testing Shake Motor
32 Testing Shake Motor Procedure
Changing Shake Motor
33 Changing Shake Motor Procedure
Changing the V-Belt
34 Changing the V-Belt Procedure
Removing Circuit Board
35 Removing Circuit Board Procedure
Installing Rubber Pads
36 Installing Rubber Pads Procedure
Replacing/Adjusting DC Motor
38 DC Clamping Motor Replacement/Adjustment
Adjusting Clamping Force
39 Clamping Force Adjustment Procedure
Reversing Door
42 Reversing Door Procedure
Replacing Super-Struts
44 Removing the External Panels
44 Removing the Super-Struts
47 Installing the Super-Struts
Replacing Crankshaft
50 Access the Crankshaft
50 Remove the Crankshaft
51 Install New Crankshaft
Reassembling Mixer
53 Reassembling Mixer Procedure
54 Test Procedure
Parts Section
55 Sheet and Metal Outer Frame
59 Control Box Assembly
61 Inner Frame
63 Shake Frame
65 Clamping Motor Assembly
69 Top Plate Assembly
70 Crankshaft Assembly
Warranty
76 Paint Equipment Limited Warranty
Harbil 5G Mixer | 3