Page 21 of 7
Acc
3.3.8
Accessories
customer.
Perfo
3.4
This product
specifications
The following
help with the
temperature,
data. If requi
application ca
Ope
3.4.1
Pumped liquid
limits*
Maximum amb
temperature*
Maximum pum
*
Subject to w
Special desig
pumps opera
limits. Conta
available for
4 INSTA
Equipm
must comply
regulations.
potentially ex
Loca
4.1
When equipm
months, a co
accordance w
located to allo
maintenance
lifting and sho
supply of liqu
arrangement
Insp
4.1.1
Six months p
Flowserve P
employed to
and the facili
noticed, the F
may require
equipment in
some compo
VERTICA
76
essories
may be fitted
ormance an
has been sele
s of the purcha
g data is includ
installation. It
materials and
red, a definitive
an be obtained
erating limits
d temperature
bient
mp speed
written agreem
gns and mate
ating above a
act Flowserve
your specific
ALLATION
ment operated
y with the rele
See section
xplosive atmo
tion
ment has been
omplete inspec
with section 2.
ow room for a
e and inspectio
ould be as clo
uid to be pump
t drawing for th
pection prior
prior to the sch
ump Division
conduct an in
ty. If any dete
Flowserve Pu
a partial or co
ncluding resto
onents.
AL TURBINE
d when specif
nd Operati
ected to meet
ase order. Se
ed as addition
is typical and
seal type may
e statement fo
d from Flowser
5 ºC (40 ºF) to +
Up to +40 ºC (10
refer to the nam
ment from Flo
erials may be
and below the
e for upgrade
c application.
d in hazardou
evant explosio
1.6.4,
Produc
ospheres.
n in storage fo
ction should be
.4.3. The pum
ccess, ventila
on with ample
ose as practica
ped. Refer to t
he pump set.
to installatio
heduled instal
representativ
nspection of th
erioration of e
mp Division r
omplete disma
ration and rep
E PUMPS (VT
fied by the
ion Limits
the
ee section 1.5.
nal information
factors such a
y influence this
or your particul
rve.
+80 ºC (176 ºF)
04 ºF)
meplate
owserve.
available for
se specified
options
us locations
on protection
cts used in
or greater than
e conducted in
p should be
tion,
headroom for
able to the
the general
on
llation date, a
e is to be
he equipment
equipment is
representative
antling of the
placement of
TPS) CENTRI
to
as
s
ar
n 6
n
r
e
P
4.2
The pu
ventilat
headro
practic
Refer t
dimens
4.2.1
The fo
actual
a) Ma
po
b) Ch
up
c) Ch
d) Ch
wil
e) Ch
an
three p
should
necess
On
ag
clu
On
ag
male s
shaft c
avoide
connec
improp
to the p
F
4.3
pump
depend
vibratio
IFUGAL PUM
Preparatio
ump should be
tion, maintena
oom for lifting a
cable to the su
to the general
sions and deta
General ins
ollowing check
installation.
ake sure that
ower supply sy
heck the sum
p.
heck the liquid
heck the insta
ll safely hand
heck all pump
ny shipping an
Alwa
places when l
d be attempted
sary for a suc
n hollow shaft
gainst the sha
utch
n solid shaft d
gainst the cou
App
shaft threads
connection. E
ed.
Alwa
cting driver to
per motor dire
pump.
Foundatio
The
units to their
ds on the size
on limitations
MPS ENGLIS
on
e located to al
ance and insp
and should be
pply of liquid t
arrangement
ails.
stallation ch
ks should be
motor namep
ystem match
p depth and p
d level in the
allation equipm
dle the pump w
p connections
nd handling re
ays support s
lifting or insta
d without adeq
cessful install
t drivers, chec
aft size, which
drivers, check
upling bore siz
ly thread lubr
only at the tim
Excess lubrica
ays check mo
o pump. Rese
ection can cau
n/Anchor B
re are many m
foundations.
e of the pump
. Non-compl
SH 71569224
flowse
low room for a
ection with am
e as close as
to be pumped
drawing for th
heck-list
made before
plate ratings a
correctly.
pump length m
sump.
ment to be su
weight and si
s (bolts, nuts e
elated problem
shafting in at l
alling. No inst
quate equipm
lation.
ck the clutch
h must go thro
k the motor sh
ze
ricant sparing
me of making
ant should be
otor rotation be
erve rotation d
use extensive
Bolts
methods of in
The correct m
p unit, its loca
iance with the
4
– 02-15
erve.com
access,
mple
.
he pump
starting
and the
match-
ure that it
ze.
etc) for
ms.
least
tallation
ment
size
ough the
haft size
ly to
up
e
efore
due to
damage
nstalling
method
ation and
e