Page 44 of 7
Initia
5.7.5
heating li
starting th
a) If the dis
open the
The disc
system r
maintain
pump an
b) OPEN
a
c) Prime
th
operatio
d)
E
before st
e) Check
th
f) Start
pre
required
g) Start
the
there is a
stop the
Trouble
determin
valve closed
h) Open
ve
is vented
vents.
caution when
liquids. Wea
caustic, corro
Do not breath
flames or hot
i) Open
the
the unit a
j) Check
c
connecti
If possible, th
approximate
will allow the
parts to "run
on future sta
upon startup
the pumpage
handling larg
VERTICA
76
al Starting
Ensure flu
quid supplies
he pump.
scharge line h
e discharge va
charge valve i
resistance to
n pump flow ra
nd motor coul
ll inlet valves
e pump & ch
n (check the
Ensure all ven
tarting.
he motor conn
e-lubrication li
.
e pump and o
any difficulty,
pump immed
Shooting Cha
ne the probab
Do not run
for a period
ent connection
d of all trappe
n venting and
r protective c
osive, volatile
he toxic vapo
t surfaces in t
e discharge v
at its design c
omplete pum
ons, or impro
he pump sho
ely one half ho
e bearings, pa
-in" and reduc
arts.
If abrasive
p, the pump sh
e is clean. St
ge amounts o
AL TURBINE
ushing and/or
s are turned O
has a valve in
alve closest to
s intended to
the pump. Fa
ates within the
d result in sev
.
eck lubricatio
liquid level).
nt connections
nections.
quid flow on
bserve the op
excess noise
diately and ref
art (section 7.
ble cause.
n the pump w
longer than 3
ns and ensure
ed vapor befo
Observe e
d or draining h
lothing in the
e, flammable o
rs. Do not all
he vicinity of t
valve as desir
conditions.
p and driver f
oper operation
uld be left run
our on the init
acking or seal
ce the possib
es or debris a
hould be allow
topping the pu
of abrasives (a
E PUMPS (VT
cooling/
ON before
it, partially
o the pump.
o add sufficien
ailure to
e limits of the
vere damage
on system in
s are closed
pump if
peration. If
e or vibration,
fer to the
.0) to
ith the outlet
30 seconds.
e that the unit
re closing the
extreme
hazardous
presence of
or hot liquids.
ow sparking,
the equipmen
red to operate
for leaks, loos
n.
nning for
tial startup, th
ls, and other
bility of trouble
re present,
wed to run un
ump when
as is
TPS) CENTRI
nt
e
e.
t
e
.
nt.
e
se
is
e
ntil
someti
pump a
allowe
Every
lines, s
pump.
bearing
checke
require
supply
supply
5.7.6
The ch
service
Lubrica
analys
interva
The m
consid
the driv
with th
Flowse
bases,
5.7.7
Pumps
suppor
Machin
are ba
pumps
(N) tak
conditi
and re
pump o
be take
5.7.7.1
Motor
0.75
7.5 t
75 to
N = Nor
IFUGAL PUM
imes present
and cause m
d to continue
effort should
sump, etc. so
In th
gs the source
ed against the
ements for an
y pressure or
y before pump
Frequency
haracteristics
e will determi
ant and pump
sis is useful in
als.
otor bearing t
dered for its lu
ver manufact
he pump. If do
erve.
Nev
, thickeners o
Normal vib
s generally fa
rt machines w
nery standard
ased on those
Alar
s should be ba
ken on the pu
ion. Measurin
ecording will h
or operating c
en at the pum
Typical a
1
for vertic
types
r rating kW (hp)
5-to 7.5 (1-10)
to 75 (10 -100)
750 (100 -1000)
rmal; Alarm = N
MPS ENGLIS
on initial star
ore damage t
e operation.
be made to k
o that abrasive
he case of pro
e of product s
e order. Ther
n external clea
the commenc
p start-up.
y of lubricatio
of the installa
ne the freque
p/motor beari
n optimizing lu
temperature l
ubrication req
turer’s user in
ocuments are
ver mix grease
or additives.
bration levels
all under class
within the Inte
d and maximu
e standards
rm and trip va
ased on the a
ump in a fully
ng vibration a
help to track a
conditions. M
mp/motor inter
allowable fiel
cal turbines-
Vibration
velocity-
unfiltered
N
N
N
X1.25; TRIP = N
SH 71569224
flowse
rting) may loc
than the pum
keep abrasive
es will not ent
oduct lubricate
supply should
re may be
an supply, pa
cement of lub
on
ation and sev
ency of lubrica
ng temperatu
ubricant chan
limitations sh
uirements. R
nstructions su
e not found co
es containing
s, alarm and
sification of rig
ernational Rot
um vibration l
alues for insta
actual measu
commissione
at regular inte
any deteriorat
Measurements
rface.
ld vibration v
sump or wet
Vibration
mm/sec (in./se
6.1 (0.24
6.1 (0.24
6.1 (0.24)-7.1
N X 2.0
.
4
– 02-15
erve.com
ck the
p is
es out of
ter the
ed
be
rticular
brication
verity of
ation.
ure
ge
ould be
Refer to
pplied
ontact
different
trip
gid
tating
evels
alled
rements
ed (new)
ervals
ion in
s shall
values
t pit
ec) rms
4)
4)
(0.28)