![Flowserve VPC User Instructions Download Page 23](http://html.mh-extra.com/html/flowserve/vpc/vpc_user-instructions_2308578023.webp)
Page 23 of 7
Examp
Leve
4.3.3
The suction
and aligned
flange is leve
precision ma
the equipme
flange moun
0.16 mm/m (
the grout to s
pump is insta
surface leve
proceed with
assembly [10
discharge he
[372].
Check to ma
respect to th
(0.002 in./ft)
leveling data
Example of a
VERTICA
76
ple of pump m
eling of pum
barrel [315] is
with the anch
eled by using
achinist's leve
ent mounting s
ting surface n
(0.002 in./ft) u
set for at leas
alled. Rechec
lness after the
h the pump in
01] into the ba
ead flange bo
ake sure that t
e barrel flang
and final torq
a is to be reco
a pump install
AL TURBINE
mounted on a
mps with the s
s first lowered
hor bolts. The
a master lev
el. Levels sho
surfaces. The
needs to be le
using shims a
st 72~80 hour
ck the barrel m
e grout is set
stallation. Low
arrel and alig
olt holes to the
the pump is s
ge to within 0.
que the nuts [
orded for futur
ed with a suc
E PUMPS (VT
soleplate
suction barre
d into the pit
suction barre
el or a
uld be taken o
e suction barre
eveled to with
and grout. Allo
rs before the
mounting
and then
wer the pump
n the
e flange bolts
still level with
16 mm/m
373]. The
re reference.
tion barrel.
TPS) CENTRI
el
el
on
el
hin
ow
p
4.3.4
The so
and ali
suction
anchor
solepla
using a
Levels
surface
needs
in./ft) u
Allow t
the pu
surface
procee
assem
discha
[372].
Chec
resp
(0.0
leveli
Exam
G
4.4
Where
After a
the cou
should
engine
Flowse
IFUGAL PUM
Leveling o
mounted o
oleplate [23] is
igned with the
n barrel [315]
r bolts. Torqu
ate. The suct
a master leve
s should be ta
es
.
The suctio
to be leveled
using shims
the grout to s
mp is installe
e levelness a
ed with the pu
mbly [101] into
arge head flan
ck to make su
pect to the ba
002 in./ft)
and
ing data is to
mple of pump w
Grouting
e applicable, g
adding pipe w
upling alignm
d then be grou
eering practice
erve service c
MPS ENGLIS
of pumps with
on a soleplat
s first lowered
e anchor bolts
into the pit a
ue nuts to sec
tion barrel fla
el or a precisio
aken on the eq
on barrel flan
d to within
0.1
s and grout u
et for at least
ed
.
Recheck th
after the grout
ump installatio
o the barrel an
nge bolt holes
ure that the pu
arrel flange to
d final torque
be recorded
with a suction
soleplate
grout in the fo
work connectio
ment, the mou
uted in accord
e. If in any d
center for adv
SH 71569224
flowse
h suction ba
te
d onto the fou
s. Then, lowe
nd aligned wi
cure suction b
nge is leveled
on machinist's
quipment mo
ge mounting
6 mm/m (
0.0
under the sol
t 72~8
0
hours
he barrel mou
t is set and th
on
.
Lower the
nd align the
s to the flange
ump is still lev
within
0.16 m
the nuts [373
for future refe
barrel mount
oundation bolt
ons and re-ch
nting plate/so
dance with go
oubt, please
vice.
4
– 02-15
erve.com
arrel
undation
er
ith the
barrel to
d by
s level.
unting
surface
00
2
leplate.
s before
unting
en
e pump
e bolts
vel with
mm/m
3]
.
The
erence.
ted on a
ts.
hecking
oleplate
ood
contact