Page 26 of 7
See section 4
shaft drivers
leveling deta
Insta
4.5.2
fully
Lif
4.5.2.1
See lifting m
Eq
4.5.2.2
ins
a) Mobile
c
entire we
b) Cable sli
lifting eye
c) Ordinary
wrenche
wrenche
cloth.
d) Thread s
connecti
Th
vibration is fr
straightened
and great ca
Always supp
lifting or insta
inside shippi
individual pa
Inspect all co
parts before
Lifting heavy
appropriate t
Un
4.5.2.3
as
a) Clean
th
other for
b) Flush
the
water.
c) Clean
all
spots fou
emery cl
d) Clean
all
equipme
VERTICA
76
4.4.4 for coup
and section 4
ils.
allation of pu
y assembled
fting
ethods in sec
quipment and
stallation of a
rane capable
eight of the pu
ings for attach
es.
y hand tools: P
es, socket set,
es, wire brush,
sealing compo
on and light m
e single most
rom a bent sh
to stringent t
are must be ex
port shafting in
alling.
Parts and
ng containers
ackages.
ontainers, cra
discarding.
y objects is da
tools and proc
ncrating and
sembled pum
e parts of all d
eign matter.
e pump inside
l machined su
und on the ma
oth.
l threaded con
ent.
AL TURBINE
pling installatio
4.2.1~4.2.4 fo
umps that ar
ction 2.3.
d tools requi
a fully assem
of hoisting an
ump and moto
hing to the pum
Pipe wrenches
screwdrivers
, scraper and
ound designed
machinery oil.
t common cau
haft. Shafting
tolerances pri
xercised in its
n at least thre
accessories
s, or attached
ates and skids
angerous. Us
cedures is mu
cleaning of
mp
dirt, packing m
e and outside
urfaces. Rem
achined surfac
nnections and
E PUMPS (VT
on on solid
or pump
re shipped
ired for
mbled pump
nd lowering th
or.
mp and motor
s, end
s, Allen
fine emery
d for type of
use of pump
g is
ior to shipping
s handling.
ee places whe
may be place
d to skids in
s for attached
se of
ust.
a fully
material and
with clean
move any rust
ces with fine
d any accesso
TPS) CENTRI
he
r
g
en
ed
d
ory
4.5.2.4
If a bas
m (0.00
See se
Positio
founda
thorou
installa
Set up
centere
the bow
Lower
the cla
on a fla
and red
a) Wh
pu
fas
bo
b) Lif
us
c) Po
the
the
d) If
a
inc
(le
e) If
a
thi
If the p
proced
section
a) Ins
mo
fou
b) If
s
so
so
c) Le
req
d) Ch
an
e) Ins
IFUGAL PUM
Installing
4
se plate is use
02 in. per ft),
ections 4.2.1~
on lifting equip
ation opening.
Sum
ghly cleaned
ation.
p installation u
ed directly ov
wl assembly
the bowl ass
amps or holdin
at surface. T
duce possibili
hen installing
ump assembly
stened to the
owl assembly
ft the pump to
sed, attach it to
osition pump o
e discharge of
en lower onto
a stuffing box
cluded, attach
eft hand thread
a mechanical
s point per the
pump includes
dure as listed
n 2.3)
stall the suctio
ounting flange
undation.
soleplate is us
oleplate and m
oleplate.
evel the solep
quired.
heck to ensur
nd other foreig
stall the pump
MPS ENGLIS
g the fully as
ed, level the p
grout and anc
~4.2.4 for pum
pment so it wil
.
mp and piping
of all loose d
unit so that th
ver the well or
and suction b
sembly into th
ng device tha
This is to stabi
ity of cross th
152 mm (6 in
y, leave the pu
wooden skid
is raised to a
o a vertical pos
o the bowl as
over sump or
f the pump wi
the base. Le
and a hollow
h the head sha
ds).
seal is includ
e attached ins
s a suction ba
below. (See
on barrel first
e and bolts di
sed, mount a
mount the suc
plate & the suc
re suction bar
gn material.
p.
SH 71569224
flowse
ssembled pum
plate to 0.16 m
chor in place.
mp leveling det
ll center over
g should be
debris before
e lifting cable
r sump. Care
barrel with a c
e well or sum
at is attached
lize bowl asse
reading the sh
n.) or 203 mm
ump securely
(as shipped)
vertical positi
sition. If a stra
sembly.
suction barre
ith external pi
evel the entire
shaft driver a
aft to the pum
ed, install the
structions.
arrel (can), fo
lifting instruct
t and grout the
irectly to the
and grout the
ction barrel on
ction barrel fla
rrel is free of d
4
– 02-15
erve.com
mp
mm per
tails.
the
starting
e will be
efully lift
clamp.
mp. Set
to bowls
embly
haft.
(8 in.)
until the
on
ainer is
l. Align
ping
e pump.
are
mp shaft
e seal at
ollow the
tions in
e
nto the
ange as
debris