Installation checklist
Mounting angles or places have been inspected for burrs, inconsistencies and trueness
Frames have been inspected and are in good condition
Surfaces for load cell mounting blocks are rigid and have been reinforced
Check all bearing bracket welds (see welding procedure page 10)
Check all bolts are torqued to specifications (see page 12)
Check all connectors are properly inserted and tightened
Check all cables are routed and secured in protected areas of the frame
Indicator installation: see Indicator Operators Manual
System calibration: see Indicator Operators Manual
Routine Maintenance
To ensure your onboard weigher operates safely and accurately follow these four periodic steps:-
1. Inspect all weld for signs of cracking or corrosion
2. Retighten all fasteners to specified torque values
3. Inspect cable and connectors for damage, tightness and cleanliness
4. Clean truck/trailer suzi connectors