We reserve the right to change designs and technical specifications of our products.
9
ENG
All Flamco products should be installed by a Qualified Person with the relevant qualifications
to carry out the required services and be physically and psychologically capable. The area of
responsibility, competence and supervision of personnel is the duty of the Operator.
Operating instructions are transferred by Flamco representatives or others assigned by them during
delivery negotiations or on demand.
Training for the required services, installation, dismantling, commissioning, operation, inspection,
maintenance and repair are part of the training / further education for service engineers of the
Flamco branch offices or named service contractors.
These training courses cover information on required installation conditions, but not their
implementation.
On-site services include transportation, the preparation of an operations room with the requisite
foundation engineering to accommodate the system, and the requisite hydraulic and electrical
connections, the electrical installation for the power source of the expansion automat and
installation of the signal leads for the IT equipment.
Required service
Professional group example
Relevant qualifications
example
Storage transportation
Logistics, transport,
warehousing
Transport and warehousing
specialist
Assembly, dissassembly,
repairs, maintance. Re-
commissioning after adding
or changing components.
Inspection.
Installation and building
services
HVAC specialist
First commissioning of
configured control unit
(generic), re-commissioning
after power cut, operation
(work on the terminal and
Flextronic control unit)
People with operations room
clearance with knowledge
gleaned from this guide.
Electrical installation
Electrical engineering
Specialist in electrical
engineering/ installation
Initial and re-inspection of
electrical systems
Qualified person (QP) with
certfication in Electrical
engineering.
Inspection before
commissioning and
re-inspection of pressure
equipment
Installation and building
services engineering performed
in the context of technical
inspection
Qualified person (QP)
Summary of Contents for FlexFiller Direct G4
Page 1: ...www flamcogroup com manuals FlexFiller Direct G4 ENG Installation and operating manual...
Page 33: ...We reserve the right to change designs and technical specifications of our products 33 ENG...
Page 34: ...Manual FlexFiller Direct G4 34...
Page 35: ...We reserve the right to change designs and technical specifications of our products 35 ENG...