38
Assembly Plans:
The assembly of the SD series is very easy, as the product is shipped mostly pre-
assembled. The below information will help you in installing the SD series. With
a program called Publisher it is possible to view the assembly as a video and
watch it on our Iphone-Ipad or Android phone. A guide on how to do this is
provided.
All the weights of the products are given in the product pages and in the
brochures. Even though we feel that all products can be carried by two adults,
individual conditions may vary. It is best to check the weights of the equipment
and the assembly site and decide if you need any additional help or equipment to
lift the goods.
To repeat what is said in the beginning: The height of the SD series is always
standard. To accommodate for the different surfacing depths we use extra
pieces. This makes production standard and results in lower lead times for our
customers. For loose fill surfaces, we use what we call a loose fill surface adaptor.
For synthetic surfaces, we use synthetic surface plates.
Assembly plan when a synthetic surface is used:
1.
On the anchor, place the required number of synthetic surface plates. The
required number depends on the depth of the synthetic surface. For every 10
mm of synthetic surface, you need one plate. So, for example, for a 30 mm
synthetic surface, you need 3 plates.
2.
For synthetic surfacing more than 50 mm, it may be a good idea to place a loose
fill surface adaptor. Please contact us for information.
3.
Apply the surfacing.
4.
Continue as you would when installing without safety surfacing ( A)
Assembly plan when a loose fill surface is used:
I.
On the anchor, place the loose fill surface adaptor.
II.
Fill the surfacing.
III.
Continue as you would when installing without safety surfacing ( A)
Assembly plan when there is no safety surface:
A.
Place the unit on the bolts of the anchor.
B.
Tighten all bolts.
C.
Place the ground covers on the products.
D.
Secure the ground covers using bolts provided. Make sure the ground cover is
secured to the central post also.
E.
Remove all packaging.
SD 01-08 involves only one central post, whereas SD 09 and 10 involve two. The
only difference during assembly is that SD 09 and 10 requires both central posts
to be assembled.
After all this is done, assemble the labels. It is vital that all labels are assembled.
A drawing has been added to the end of the assembly section to help you do this.
Summary of Contents for SD 01
Page 1: ...FITOUT SD Series Product Manual September 2012 v5 ...
Page 23: ...Safety Zone for SD 01 ...
Page 24: ...Safety Zone for SD 02 ...
Page 25: ...Safety Zone for SD 03 ...
Page 26: ...Safety Zone for SD 04 ...
Page 27: ...Safety Zone for SD 05 ...
Page 28: ...Safety Zone for SD 06 ...
Page 29: ...Safety Zone for SD 07 ...
Page 30: ...Safety Zone for SD 08 ...
Page 31: ...Safety Zone for SD 09 ...
Page 32: ...Safety Zone for SD 10 ...
Page 35: ...Foundation Plan for no surfacing SD 09 10 Foundation Plan for Synthetic Surfacing SD 01 08 ...
Page 39: ...Assembly Plan Drawings for Synthetic Surface SD 01 08 SD 09 10 ...
Page 40: ...Assembly Plan Drawings for Loose Fill Surfacing SD 01 08 ...
Page 41: ...Assembly Plan Drawings for Loose Fill Surfacing SD 09 10 ...