www.eu.fishersci.com/fisherbrand
24
overflow sprout on the PE tank, and put the end with check valve into a
sink. Tubing length should be just long enough so that the check valve end
is hanging in the sink.
5) Screw the Tank Vent Filter to the top of the PE tank (see picture)
6) Plug the wire from the liquid level sensor on the tank to the Sensor inlet at
the back of the system. Tighten the cap.
7) Install the faucet:
a) Remove the knob and water outlet
from the package. Twist on the
water outlet to the knob, then
remove the yellow tape from
O-ring.
b) Screw on the assembled faucet to the tank.
For the 2-Pass RO+UP systems
1) Cut another piece of the1/4 inch (6.35 mm) tubing; connect the “SPARE”
port on the system and the "TO SPARE" port on the PE tank base.
2) Unwind the DC power cord in the base of the PE tank, and plug it into the
DC power port on the back of the system.
2.4.4 Connecting the Tubing to the Drain
Cut appropriate length from the provided 1/4 inch tubing. Then connect it to
DRAIN at the back of the system. Put the other end into a sink.
Note: DO NOT install the final capsule filter!
The attached final filter will be installed after system initial start-up and
degassing in the next chapter.
End of System Installation
Proceed to "System Start Up and Operation"
Knob
Connect there
Water outlet
Nut
O-ring