Optional Equipment
4 5
Travis Industries
9 3 5 0 8 1 0 3
1 5 1 0 0 2
2
Attach the blower box to the framing or floorboards of the home following the instructions below.
Wall or Ceiling Mounting
b
Attach the wall mounting
brackets to the blower box.
Mount the bracket to
these holes for 2 x 4 walls
Mount the bracket to
these holes for 2 x 6 walls
Cut a hole between wall
framing members for the
blower assembly.
a
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
5-1/4"
16"*
* This blower was designed for framing on 16"
centers - construct additional framing if needed.
c
Slide the blower, with
wires, into the hole cut
in step "a". Attach
with four screws.
AA
AA
AA
AA
AA
AA
A
A
A
A
A
AA
AA
AA
AA
AA
AA
AA
AA
AA
AA
Floor Mounting
Cut a hole between floor joists
for the blower box.
AAAAA
AAAAA
AAAAA
AAAAA
AAAAA
AAAAA
AA
5-1/4"
14"
a
b
c
Attach the floor boot to the blower box with the included screws.
Slide the blower into the hole
cut in step "a". Attach with four
screws.
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
A
A
The screws
attach to either
of these pairs of
holes. Use the
upper pair for
thick flooring, the
lower pair for
thin flooring.