
9
TECHNICAL SPECIFICATION
29
9-D&E: Riello Burner Specification
ELECTRODE SETTING
Riello RDB
RIELLO BURNER START-UP CYCLE
Attention
Before assembling or
removing the nozzle
loosen screw (A) and
move electrodes forward.
NOTE: Above information provided relevant to Riello RDB Burner. The
Firebird ‘S’ Range has been tested and will operate equally efficiently
using Ecoflam or Sterling Burners which may also be fitted
as original equipment.
Refer to separate burner instructions booklet packed with boiler. Separate
Riello Burner instructions are also included when these burners are fitted.
Always consult these as variations in specification can occur from time to
time which may not be included in this manual. Information is more
complete in appropriate burner manuals.
Summary of Contents for HEAT PAC 120/150
Page 2: ......
Page 15: ...4 FLUE SYSTEMS 13...
Page 24: ...8 FAULT FINDING 22...
Page 25: ...8 FAULT FINDING 23 T Repair or Replace Oil Pump r No...
Page 30: ...9 TECHNICAL SPECIFICATION 28 9 D E Riello Burner Specification...
Page 33: ...System Oil Boiler PART 2 System Filling and Testing 31...
Page 39: ...37 System Oil Boiler PART 3 Spare Parts...
Page 54: ...NOTES...