
4
FLUE SYSTEMS
14
4-D Balanced Flue Siting
Notes:
1
. The terminal should be positioned to avoid combustion
products entering the building or accumulating in stagnant
pockets around buildings.
2
. The terminal must be protected by a guard if it is less than 2
metres above ground level or in a position where any person
has access to it (i.e. a balcony).
3
. A heat protection shield should be fitted if the terminal is less
than 850mm from a plastic or painted gutter or less than
450mm from painted eaves.
Always check for any Building Regulations amendments which may
have been issued after the publication of this manual
A.
Below a gutter or
sanitary pipework.
B.
Horizontal from
opening, airbrick,
window etc.
C.
Above ground or
balcony level.
D.
Below eaves or
balcony
E.
From an internal
or external corner.
F.
From a terminal
facing the terminal.
G.
From a surface
facing the terminal.
H.
Vertical from
terminals on
the same wall.
I.
Horizontal from
terminals on the
same wall.
J.
Below an opening, airbrick, window etc.
K.
From vertical sanitary pipework.
L.
Vertical flue from wall.
Book three Nov. 1997
A
B
C
D
E
F
G
H
I
J
K
England & Wales 1991
-
600
-
-
600
-
-
-
-
600
-
Scotland 1990 Balanced*
600
-
600
600
600
600
600 1500 600
600
600
Low level* 1000
-
600 1000 600
600
600 1500 600
600 1000
Northern Ireland 1994
-
600
-
-
600
-
-
-
-
600
-
Republic of Ireland 1997
-
600
-
-
600
-
-
-
-
600
-
*Where the terminal is within 1 metre of any plastic material, such material should be protected from the
effects of combustion products of fuel. There are additional general requirements in most Regulations and
Standards that the flue must be positioned so that it does not cause a nuisance and permits the dispersal of
combustion products.
NOTE:
The Buildings Regulations clearances shown above are
minimum
allowed. Account should
also be taken of prevailing site conditions, as the above minimums may in certain circumstances
need to be increased. If in doubt contact manufacturer for advice.
See note at foot of page
Building Regulations
Summary of Contents for HEAT PAC 120/150
Page 2: ......
Page 15: ...4 FLUE SYSTEMS 13...
Page 24: ...8 FAULT FINDING 22...
Page 25: ...8 FAULT FINDING 23 T Repair or Replace Oil Pump r No...
Page 30: ...9 TECHNICAL SPECIFICATION 28 9 D E Riello Burner Specification...
Page 33: ...System Oil Boiler PART 2 System Filling and Testing 31...
Page 39: ...37 System Oil Boiler PART 3 Spare Parts...
Page 54: ...NOTES...