
25
9
TECHNICAL SPECIFICATION
9-B: Technical Specifications and Recommendations
Heat Output
50-120,000 Btu/Hr
Electricity Supply
230 v - Boiler~50 Hz
To be fused at 5 amp
System Pipe Connections (on boiler)
Heating Flow
22 mm (28mm - 90-120,00 Btu/Hr)
Heating Return
22 mm (28mm - 90-120,00 Btu/Hr)
Mains Cold Water Boiler
connection for filling loop
15 mm
Safety pressure Relief Valve
Outlet
15 mm
All Copper Tube connections:
BS 2871 Copper Tube
Pressure Jet Oil Burner
Riello RDB or Ecoflam Flair or Bentone Sterling
Circulating Pumps
Grundfos UPS 25/60
Flue Pipe Connection
Conventional Flue Socket
To take tail piece for 4”
(100mm)
& 5”
(125mm)
S/S Flue Pipe
Balanced Flue Assembly
5”
(125mm)
Concentric Flue
Weight (Dry) - Incl. Pallet
50-70btu’s
- 160 Kg
70-90btu’s
- 162 Kg
90-120btu’s
- 177 Kg
Water Content - Total
50-70btu’s
- 59 Litres
70-90btu’s
- 59 Litres
90-120btu’s
- 68 Litres
Thermostats
Boiler Central heating Control
(Adjustable)
65˚C - 85˚C
Boiler Safety Limit
110˚C
Boiler integral Expansion
Vessel nominal capacity
10, 12 & 14 Litres pre-charged to 1 Bar
Heating System (Sealed)
Fit in accordance with BS 7074
Part I, BS 5449, OFTEC
Standards, etc.
Max. Operating Pressure
2.5 Bar
(Follow all BS & OFTEC Standards)
Max. System Pressure (Cold)
1.5 Bar
Min. System Pressure (Cold)
0.5 Bar + 0.3 Bar
Boiler Test Pressure
4.5 Bar
Safety Valve Operating Pressure 3 Bar
Heating System Pressure Gauge
(mains supply excepted)
0 - 6 Bar Range
Flue Draught Reqd.
(Conventional Flue)
Min: 0.040 In WG
Max: 0.15 ln WG
Water side resistance-10˚C Diff 26.8 ins WG
-20˚C Diff 8.6 ins WG
Summary of Contents for HEAT PAC 120/150
Page 2: ......
Page 15: ...4 FLUE SYSTEMS 13...
Page 24: ...8 FAULT FINDING 22...
Page 25: ...8 FAULT FINDING 23 T Repair or Replace Oil Pump r No...
Page 30: ...9 TECHNICAL SPECIFICATION 28 9 D E Riello Burner Specification...
Page 33: ...System Oil Boiler PART 2 System Filling and Testing 31...
Page 39: ...37 System Oil Boiler PART 3 Spare Parts...
Page 54: ...NOTES...