
26
Festo — YXCR — 2021-07b
Transport
Removing locking module from the Z-module EHMZ-EGC/EHMZ-DGEA
1
1
2
2
Fig. 30: EHMZ-EGC
1
1
2
2
Fig. 31: EHMZ-DGEA
1
Locking module
2
Z-axis
1. After assembly and before the product is energised:
Support the Z-axis from below.
2. Remove the locking module.
3. Move the Bring Z-axis slowly into the lower end position.
4. Mount the motor.