40
Multi Boring Machine
FD 21 professional
Alternative procedure to that in:
—> Corpus 90 degree dowel connection
Process step 1
Mounting the stop extension onto the lateral clamps
Process step 2
position the attachments required
Process step 3
vertical bore to fixed intermediate stop
Alternative procedure to that in:
—> Corpus 90 degree dowel connection
Process step 1
pivot the boring head to 45 degrees
Process step 2
Check depth required
- Adjust as necessary
8.6.2 Fixed 90° dowel joint
8.6.3 45° dowel joint
Fig. 8-6: Fixed 90° dowel joint
Fig. 8-7: 45° dowel joint
Operation