19
X
!
Multi Boring Machine
FD 21 professional
4.5.3 Transport with a pallet jack
Fig. 4-4: Transport with a pallet jack
Transport, packaging and storage
Attention! Heavy dead weights can easily cause an injury / Danger of tipping
Consider the centre of gravity when hoisting the machine (danger of overturning).
Note: Ensure that there is sufficient space to work around the machine.
In order to maintain and operate the machine properly, it must be set up at least 500 mm away from the wall,
parallel to the work direction (measurement X).
To operate and maintain the machine, leave a min. of 2000 mm space all around the machine.
Push the forks under the gaps in the machine frame. (see
Fig.)
!
Cutout hole in the machine frame