Maintenance

MrSteam steambath generators require little maintenance.
Other than draining, maintenance procedures are minimal. When
AutoFlush is not installed the manual drain valve should be opened
fully flushing out accumulated materials, salts and other particles
which are natural by-products of boiling water, after each use.

Flush a minimum of two-three hours after the control

has been turned off to insure that the water has cooled.

Draining immediately after a steam cycle may

expose PVC and other piping to high temperature water. Check
local codes. The unit will refill automatically after 10 minutes. In
areas of hard water, a MrSteam AutoFlush

®

system is recommended

for generator longevity.

Steam Generator Operation

MrSteam recommends beginning steam bathing at a low tempera-
ture setting to gauge comfort and safety levels. Set the duration at
10 minutes max. to gauge comfort and safety levels. This will allow
the steam generator to heat up and begin producing.

11

Initial Start-Up and Checkout

1. Turn on control. Follow specific instructions provided

with controls.

2. Steam will begin to appear in approximately 5 min-

utes at the steam head. Steam will shut off when
desired temperature is reached and will automatically
resume when room temperature drops below set
point.

3. Steam will shut off automatically when control counts

down to zero. To shut steam off manually, turn con-
trol OFF. To clear steam from enclosure area, turn
shower on before opening door.

4. If unit does not start and control does not turn ON

(control display does not light up) then turn breaker
off for 20 seconds and try again.

5. Refer to specific instruction sheets for installation,

operation and maintenance of optional equipment
and Control.

Transformer

Liquid Level
Control Board

Water Feed

Solenoid

Water Inlet

AutoFlush
Plug and Play
Connector

Thermostat

Liquid

Level Probe

Power Supply

Knock-Out

Contactor

Steam Outlet

Troubleshooting

Step 1

Check your main incoming power

to the unit.

Step 2

Verify the transformer is receiving

208/240 VAC.

Step 3

Verify that you have 24VAC coming

out of the transformer, WHT & WHT/BLU
wires, into the board.

Step 4

Verify that you have the green light

on the PC board.

Step 5

Push the white test button to run

the generator on a 10 minute test cycle.

Step 6

Verify that you have 24 VAC to the

water feed solenoid, GRY & WHT/GRY
wires (will fill when needed).

Step 7

Temporarily short out the WLS

(Purple wire) and GND (Green wire)
terminals and verify the contactor engages.

Step 8

When the red light is on, verify that

you have 24 VAC, RED & WHT/RED wires,
to the contactor.

Step 9

Check to see that you have your

main voltage on the load side of the
contactor when it is engaged.

Step 10

If all steps on the power path

were verified, turn off power to the unit
and pull the heating element via the left
hand access panel for inspection.

Do not disassemble internal components, internal components contain no serviceable parts.

FOR ILLUSTRATIVE

PURPOSES ONLY.

Some components may be omitted
or altered for clarity. Do not use for
wiring, repair or other purposes not
related to component identification.

All electrical troubleshooting to be performed by a qualified licensed electrician.

Summary of Contents for mr. steam Club Therapy CT6E

Page 1: ...mr steam Feel Good Inc Club Therapy Steambath Generator Systems Installation Operation Maintenance Manual Models CT6E CT9E CT12E CT15E Installation Operation Maintenance Manual...

Page 2: ...ical Specifications Field Power Wiring 9 Wiring Diagrams 10 Initial Start Up Checkout Maintenance Generator Operations and Troubleshooting 11 System Status Codes Liquid Level Control Board 12 AutoFlus...

Page 3: ...blood pressure and circulation A warning placard has been provided in the Information envelope This placard is an essential part of providing a safe environment for steam room users This placard must...

Page 4: ...to be installed inside the steam room when the control is mounted outside the steam room Steam Generators Specification Chart Amps for Total Adj Wire Water Usage Shipping Model No KW 240v 1PH Room Vo...

Page 5: ...r shipment by MrSteam the following must be reviewed for proper safe and enjoyable steam bathing 1 Verify that the model and accessories specifications are cor rect for the incoming line voltage 2 Ins...

Page 6: ...rovide supports under steam generator when wall mounting Keyhole slots are provided for wall mounting Insure the steam generator is properly secured and level when mounting with keyhole slots 6 Instal...

Page 7: ...formation Remote Sensor see page 16 CT SteamStop Control See page 17 for installation information iTempo Plus or iSteam Control See page 16 Field installed water supply line IMPORTANT Locate the remot...

Page 8: ...on Manual for installation information before the steam piping is installed at www mrsteam com technical downloads Steam Piping 1 2 NPT 1 Do not install any valve in steam piping Flow of steam must be...

Page 9: ...is finished STEP 4 After the wall has been finished mark on the nipple where the surface of the wall is Remove the nipple and measure the por tion that was in the wall the end to your mark Subtract 1...

Page 10: ...inches MM Water Inlet Steam Outlet Safety Valve AutoFlush Manual Drain Valve Generator Dimensions IMPORTANT NOTES Provide a minimum of 12 inches at both ends and top of the steam generator or as requi...

Page 11: ..._ 208 1 29 8 8 CT6E 150 6 0 3 17 10 10 240 1 25 8 8 3 14 12 12 ___________________________________________________________________________ 208 1 44 8 6 CT9E 360 9 0 3 25 8 8 240 1 38 8 8 3 22 10 10 __...

Page 12: ...T GRAY WHT BLUE RED WHT RED Remove Jumper when CU HTC is installed CONTROL BOARD CONTACTOR Heating Element To Probe AutoFlush CT SteamStop iTempo Plus or iSteam Control TRANSFORMER POWER INPUT L1 L2 F...

Page 13: ...from enclosure area turn shower on before opening door 4 If unit does not start and control does not turn ON control display does not light up then turn breaker off for 20 seconds and try again 5 Ref...

Page 14: ...rol Board EXPLANATION OF LED INDICATORS _____________________________________________________________________________________________________________________________________________ GREEN LED is ON wh...

Page 15: ...Open Drain Valve handle must be aligned with brass nipple 4 Connect the AutoFlush System cord connector to the three pin connector as shown Do not drain into a steam enclosure or any location where ac...

Page 16: ...oses not related to component identification Replacement Parts List ____________________________________________________________ Part No Description Product ___________________________________________...

Page 17: ...r or other purposes not related to component identification 15 Transformer Drain Line Liquid Level Control Board Fuses Water Inlet Water Feed Solenoid Safety Valve AutoFlush Valve Stainless Steel Tank...

Page 18: ...le length is 30 feet Insure that the control and or steam generator are located according ly An optional 60 foot cable is available PN 103990 60 for iTempo and PN 104117 60 for iSteam Contact a MrStea...

Page 19: ...sket The connector is keyed and will only connect in one orientation with the tab facing up LED indicator will light up when the generator is ON Using the CT SteamStop Control The CT SteamStop control...

Page 20: ...meWizard iButler iGenie iSizing iSteam iTempo iTempo Plus Making Wellness a Way of Life Music Therapy Spa Package Steam Genie Steam on Demand Steam Home SmartSizing SteamStart SteamStop SteamTherapy S...

Reviews: