20
STARTING UP THE DISPENSER
Leak Check and Prime
1
Remove the side panels by loosening the two screws located at the bottom of the panel and
then lifting off the frame.
2
Remove the drip tray by lifting and pulling forward and then remove the splash plate and front
cover to expose the solution modules.
3
Connect the BIB connectors to the syrup BIBs.
4
Establish the water supply and the CO2 supply.
Note:
the water and syrup pumps will
activate until the lines are pressurized.
5
Thoroughly check for leaks at all connections.
6
Install a ¼” I.D. tube on the sample port shown below. Open the sample valve and collect
the water/syrup in a cup. Continue to prime until syrup flow has been established and all air
has been removed from the lines. Discard the samples.
7
Repeat for all barrels.
Sample Valve on Solution Module
Sample Valve
(shown closed)
Sample port
(tube not shown)
Summary of Contents for 77 Series
Page 1: ...772 773 774 24 2396 0001 Rev C 07 30 2013...
Page 38: ...38 772 Mounting Dimensions 773 Mounting Dimensions...
Page 40: ...40 WIRING SCHEMATIC DIAGRAM...
Page 41: ...41...