
Long-term parking
4812165001.pdf
2023-05-26
Long-term parking
The following instructions should be followed
when long term parking (more than one month).
The following instructions should be followed
when long term parking (more than one month).
Fig. Roller weather protection
These measures apply when parking for a period of up
to 6 months.
Before re-commissioning the roller, the points marked
with an asterisk * must be returned
to the pre-storage state.
Wash the machine and touch up the paint finish to
avoid rusting.
Treat exposed parts with anti-rust agent, lubricate the
machine thoroughly and apply grease to unpainted
surfaces.
Engine
* Refer to the manufacturer’s instructions in the engine
manual that is supplied with the roller.
Battery
* Remove the battery from the machine, clean, grease
the cable connectors (terminals) and trickle charge the
battery once a month. The battery is otherwise
maintenance free.
Air cleaner, exhaust pipe
* Cover the air cleaner (see under the heading 'Every
50 hours of operation' or 'Every 1000 hours of
operation') or its opening with plastic or tape. Also
cover the exhaust pipe opening. This is to avoid
moisture entering the engine.
Fuel tank
Fill the fuel tank completely full
to prevent condensation.
Hydraulic reservoir
Fill the hydraulic reservoir to the uppermost level mark
(see under the heading ‘Every 10 hours of operation.’)
67
Summary of Contents for DYNAPAC CA1300 D
Page 2: ......
Page 22: ...Introduction 4812165001 pdf 2023 05 26 4 ...
Page 28: ...Safety Optional 4812165001 pdf 2023 05 26 10 ...
Page 49: ...Machine description 4812165001 pdf 2023 05 26 4812129673 Warning CALIFORNIA Proposition 65 31 ...
Page 57: ...Machine description 4812165001 pdf 2023 05 26 39 ...
Page 66: ...Machine description 4812165001 pdf 2023 05 26 48 ...
Page 96: ...Operating instructions Summary 4812165001 pdf 2023 05 26 78 ...
Page 98: ...Operating instructions Summary 4812165001 pdf 2023 05 26 80 ...
Page 104: ...Maintenance Lubricants and symbols 4812165001 pdf 2023 05 26 86 ...
Page 117: ...Maintenance Maintenance schedule 4812165001 pdf 2023 05 26 Service Checklist 99 ...
Page 118: ...Maintenance Maintenance schedule 4812165001 pdf 2023 05 26 100 ...
Page 140: ...Maintenance measures 250 h 4812165001 pdf 2023 05 26 122 ...
Page 194: ...Maintenance measures 1500 h 4812165001 pdf 2023 05 26 176 ...
Page 238: ...Maintenance 3000 5000 7000 h 4812165001 pdf 2023 05 26 220 ...
Page 284: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...