UNPACKING & INSTALLATION
(A copy of these instructions are attached to the front of the machine)
This machine has been packed in order to protect its internal components during transportation and distribution.
FASTCORP has also made unpacking and installation a quick and easy process. FASTCORP recommends the fol-
lowing steps be taken when unpacking the machine.
!!WARNING!! DO NOT PLUG IN THE MACHINE UNTIL ALL STEPS ARE COMPLETED IN
THIS SECTION. THE RETAINING BRACKETS AND THE TWO CABLE TIES MUST BE RE-
MOVED BEFORE POWERING UP THE MACHINE TO AVOID DAMAGE TO SENSITIVE
MECHANISMS.
RECEIVING INSPECTION
Upon receipt, remove packing materials from the exterior of the machine, shrink wrap, fiberboard edge protectors and
corrugated front protector from the outside of the vender. Store the fiberboard edge protectors and corrugated front
protectors for future transport use. Inspect the vender for any external or internal shipping damage. If there is any
damage, have the driver note the damage on the bill of lading and notify FASTCORP. Although the terms of sale are
FOB shipping point, which requires the consignee to originate shipping damage claims, FASTCORP will gladly help if
you must file a claim. Close the door and tighten the lock.
REMOVE SHRINK WRAP FROM CABINET PRIOR TO STORING VENDER OUTSIDE.
UNPACKING THE VENDER
Remove the shipping boards from the bottom of the vender. The shipping boards are attached to the leveling legs. To
avoid unnecessary damage to the leveling legs or base, remove shipping boards using a 1½ inch socket type wrench
and unscrew the leveling legs. Be sure to replace the legs after removing the shipping boards. Store the shipping
boards so that they can be reused anytime the machine is moved.
Once the vender is unpacked, check the service
area for any additional parts, price/product labels, service/operation manual, or other information concerning factory
equipped accessories such as coin and bill acceptors.
REMOVING THE CABLE TIES & SHIPPING BRACKET
:
Remove the shipping bracket from the Robot by unscrewing the (3) 1/4 X 20” bolt with a wrench and the cable ties
from the picker and robot assemblies
.
Refer to the following pictures for the locations of the cable ties. Store the
bracket and screws at the base of the door for future use. Finally, remove tape on freezer lid and chest.
MACHINE MUST BE UNPLUGGED!
REINSTALL ROBOT RETAINING BRACKET AND CABLE TIES WHENEVER
TRANSPORTING MACHINE.
A-3
Fig. 1
(Robot Carriage-Rack Assembly & Hose System)
REMOVE SHIPP ING
BRACKET
CUT CABLE TIE
CUT CABLE TIE