Fastbind PUREVa Xt UsER manUal | v 1.0 | © maping Co 2014
6
DRAFT
3. macHIne InsTallaTIon
3. MacHInE InStaLLatIon
Opening the package
handling the Machine
•
remove the ”brackets” on the bottom of the shipping container
with a flat head screw driver.
•
remove the top parts (cover and mantle).
•
take out the inner carton box.
•
remove all packaging material around the machine
installing the stOrage lOcker
•
lift the machine from the pallet and place it on a solid work
surface. the recommended table height is 90 cm (36 inches) and
the minimum loading capacity is 200 kg (440 lbs.).
o warnIng!
▪
the machine weights 90 kg (198 lbs.).
▪
please follow proper lifting guidelines
▪
It is strongly suggested that three people are available to
lift and move the machine safely. safe lifting positions are
highlighted on the picture in green on both sides of the
machine.
o warnIng!
▪
do not lift from the areas marked in red highlight in the
picture.
▪
lifting from the wrong locations can result in personal
injury and damage to the machine
▪
use caution when lifting the machine
•
the machine is delivered with a separate storage locker.
•
the storage locker is packages separately and its purpose is for
storing the glue cartridge gripper tool.
•
remove the packaging material around the locker.
•
attach two ring magnets (included in the delivery) to the right side
of the storage locker around the top screw heads, position marked
highlighted in green in the image.
o warnIng!
▪
the storage locker is connected with the ring magnets,
and will not stay in position if the magnets are not installed
correctly installed.
▪
ensure that the magnets are properly attached before
locker installation.
•
Install the storage locker on the left side of the machine so that
the ring magnets are against the machine’s left side panel and the
rear edge is against the left end panel.
•
the storage locker has two compartments and it is intended only
for storing glue head grippers.
o warnIng!
▪
The storage locker is not permanently fixed to the
machine.
▪
remove the locker before moving the machine.