Use and Maintenance Manual
– Spare Parts
Page 15
15) Position the arms in the trolley compartments and fasten them with the
relevant pins.
16) Position a vehicle on the arms of the lift and run an up and a down stroke to
test and compile the
“
INSTALLATION REPORT
”.
During these operations, check all the connection joints and cylinders are
not leaking.
17) Re-assemble the casings (3) and couple the electrical control unit (20) to the
casing using the prepared holes.
Fig 3b
19) Assemble the guards to the four arms of the lift as displayed in
the figure (3b).
The manufacturer cannot be held in any way liable for damage caused by
non-compliance with the aforementioned instructions and can cause the
warranty to become null and void.
Summary of Contents for FZ63/3S
Page 2: ......
Page 32: ...Page 32 Use and Maintenance Manual Spare Parts THREE PHASE ELECTRIC DIAGRAM...
Page 33: ...Use and Maintenance Manual Spare Parts Page 33...
Page 35: ...Use and Maintenance Manual Spare Parts Page 35 SINGLE PHASE ELECTRIC DIAGRAM...
Page 36: ...Page 36 Use and Maintenance Manual Spare Parts...