TRANSPORT, STORAGE, UNPACKING PROCEDURE
Examine the machine both inside and outside and notify the carrier immediately
of any damage.
6.1
TRANSPORT AND STORAGE
In order not to cause damages to the distributor, the loading and unloading manoeuvring have to be
performed with particular care.
The loading/unloading manoeuvres must be carried out by lifting the machine with a lifting truck, either motor-driven
or manual, and by positioning the forks in the area under the pallet.
To move the machine over short distances, for example inside a premises or office, the pallet need not be
used. Proceed however with maximum caution to prevent damaging the machine. It is always
prohibited
:
•
To lie the machine down;
•
To turn the distributor upside down;
•
To drag the distributor with ropes or similar;
•
To lift the distributor from the side;
•
To lift the distributor with whatever sling or rope;
It is strongly advisable never to lay the vending machine on its side so as to
ensure that the oil in the compressor does not leak from its seat. If it does, it
would no longer be possible to guarantee the correct lubrication of the
compressor itself and could lead to breakdown when starting up.
In the event that the vending machine is laid flat, place it in an environment with a
temperature no less than 18°C and wait at least 2 hours before setting the
machine at work.
As to the storage of the machines, it is appropriate that the environment of conservation is very dry with
temperatures between 0° to +40° C.
Cover the machine after having positioned it in a protected environment and anchor it to prevent it from
moving and to avoid accidental knocks. It
is important
not to put one packed machine on the other and to
maintain the vertical position shown by the arrows on the packaging itself.
6.2 UNPACKING
PROCEDURE
The packing material must be removed carefully to avoid damaging the machine. Inspect inside and outside
the cabinet for any damage. Do not destroy the packing material until the manufacturer’s representative has
examined it.
Remember to remove packing materials or equipment inside the vending machine
which could affect the correct function of the machine.
To remove the machine from the pallet, simply loosen the 4 hexagonal-head screws (2 at the back of the
distributor and 2 at the front) which secure the machine base to the pallet and which are reached by opening
the door.
To ensure correct circulation of air in the refrigeration unit, re-install the rear brackets which secure the
vending machine to the pallet, upside down.
The packing materials must be disposed of respecting the environment and the
laws in force.
When lifting the vending machine, ensure that the supporting feet are removed
from the pallet.