17
CR69
36
19
A = 6 x M24x2x120, DIN912, 10.9ZN
B = 2 x M24x2x90, DIN912, 10.9ZN
C = 6 x M24x2, DIN985, 10,9ZN
A
C
650
B
MOUNTING THE CRANE ON THE
SUPPORT LEGS
1. Clean the threads and check the size and property
class of the mounting screws (see figure).
2.
Mount the crane on the support leg frame with
six (6) M24x2x120 hex screws (A), two M24x2x90
hex screws (B) and six locking nuts (C). Tighten to
650 Nm.
Remember to re-tighten the
screws after the first test run and
first work day.
ATTENTION
Summary of Contents for CR69
Page 2: ...2 CR69 ...
Page 29: ...29 CR69 A H F E D G H C I C B B C B B 6 LUBRICATION POINTS ...
Page 36: ...36 CR69 17 8 10 16 18 20 22 21 3 6 7 12 5 13 23 9 15 11 1 19 2 4 14 CR69 SLEWING AND COLUMN ...
Page 42: ...42 ...
Page 48: ...Farmi Forest Ahmolantie 6 74510 IISALMI FINLAND 358 0 17 832 4400 info farmiforest fi ...