OPERATING MANUAL
OILSEED SCREW PRESS FARMET DUO
Page
19
of
48
4.
ON-SITE ASSEMBLY AND INSTALLATION OF THE
EQUIPMENT
The Owner must perform the assembly according to the instructions of the Producer,
best in cooperation with an expert servicing technician assigned by the Producer.
The Owner must secure a functional test of all assembled parts after the completion of
the Equipment assembly.
The wiring must be executed in compliance with valid standards and documented by a
revision. Any repairs, modifications and other work on the wiring may only be
performed by authorized persons with corresponding electrical qualifications.
The spatial organization of the pressing shop must ensure free access to the Equipment
so that it is possible to perform its maintenance and service without any difficulties.
If more than one piece of equipment is installed in the pressing shop, make sure that
the individual control elements, boxes and equipment are clearly and visibly marked so
that there is no confusion in case an emergency stop is required.
When the Equipment is installed, it has to be properly levelled into a horizontal
position using spacers that do not increase the surface pressure from the supporting leg
so that the Equipment is not twisted or distorted; use suitable base wedge blocks. If the
Equipment is attached to a steel structure together with other heavy appliances, make
sure that the other appliances are installed on the structure prior to the final levelling
using a water level.
When installing the Equipment, make sure that the Equipment is accessible for the
purpose of maintenance and oil change (access to the outlet and inlet openings, oil
level gauges, air release plugs and sight holes).
The Equipment may be installed on a floor with the bearing capacity specified in the
project.
The Equipment is oriented according to the technological disposition.
Make sure that there are tools available. It is also suitable to provide all other
equipment required for maintenance, such as various hand tools, crowbars and lifting
devices.
Check the direction of turning for all rotary devices.
The wiring circuit is included in the annex to this manual.
Summary of Contents for DUO
Page 1: ...OPERATING MANUAL OILSEED SCREW PRESS FARMET DUO ...
Page 2: ...OPERATING MANUAL OILSEED SCREW PRESS FARMET DUO Page 2 of 48 ...
Page 4: ...OPERATING MANUAL OILSEED SCREW PRESS FARMET DUO Page 4 of 48 ...
Page 6: ...OPERATING MANUAL OILSEED SCREW PRESS FARMET DUO Page 6 of 48 ...
Page 8: ...OPERATING MANUAL OILSEED SCREW PRESS FARMET DUO Page 8 of 48 ...
Page 39: ...OPERATING MANUAL OILSEED SCREW PRESS FARMET DUO Page 39 of 48 Notes ...
Page 40: ...OPERATING MANUAL OILSEED SCREW PRESS FARMET DUO Page 40 of 48 Notes ...
Page 44: ...OPERATING MANUAL OILSEED SCREW PRESS FARMET DUO Page 44 of 48 ...
Page 46: ...OPERATING MANUAL OILSEED SCREW PRESS FARMET UNO Page 46 of 48 ...
Page 48: ...OPERATING MANUAL OILSEED SCREW PRESS FARMET UNO Page 48 of 48 ...