96
Maintenance plan
Maintenance operation
Daily
(season)
40 h
Before
the
season
After
the
season
Time
interval
Screw connections
Visual inspection of screw and hydraulic connections,
tighten loose connections with the appropriate
tightening torque (table of tightening torques)
X
X
Wheels
– Tighten all wheel nuts.
For the first time after 10 hours of operation.
After changing the wheel after 10 hours of operation
M 18 x 1,5
300 Nm
M 20 x 1,5
400 Nm
M 22 x 1,5
500 Nm
X
X
Brake system
Brake lines and hoses
– check function, tightness,
fastening and clamping or breakage
X
X
Brake components
– check function, tightness,
fastening
X
X
Aerator
– drainage by drain valve
X
Drain valve
– verification of functionality, cleaning and
replacement of seals
X
Pipe filter
– cleaning
X
Brake/parking brake
– functional check, step
adjustment 25-45 mm
X
X
Brake lining
– check the condition of the brake lining,
min. thickness 3 mm
X
Wheels / axle
Tire pressure check
X
X
X
Transport axle bearings
– check and possible
adjustment of play (work in the workshop)
X