16
10
Putting the machine into operation
-
Before taking over the machine, check and control that it has not been damaged during transport and that
all the parts contained in the delivery note have been delivered.
-
Before putting the machine into operation read these operating instructions carefully. Before using the
machine for the first time be familiar with yourself with controls and overall instructions.
-
The machine showing signs of damage must not be put into operation.
-
The operator is responsible for safety and for all damages caused by operation of the tractor and the
connected machine.
-
The machine may only be connected to a tractor whose curb weight is equal to or higher than the total
weight of the connected machine.
Aggregation of a machine with a tractor
No persons may be present in the are between tractor and the machine during
connecting.
Tractor engine power requirement for the machine FALCON 3
90 kW*
Tractor engine power requirement for the machine FALCON 4
117 kW*
Requirement for TBZ tractor
Spacing of lower suspension joints
(measured on joint axels)
1010±1,5 mm,
(can also be set
910±1,5 mm)
Holes for lower suspension joints for
machine suspension pins
37,5 mm
Tractor hydraulic system requirement
Electrical distributor circuit
Circuit pressure min.190 bar
–
max.230 bar
60 l/min., 2 pcs of quick coupling
sockets ISO 12,5
Hydraulic drive circuit
Pressure in the filling branch min.130
bar
–max.230 bar, 1 pc of quick
coupler socket ISO 12,5
Pressure in the waste branch max.5
bar, 1pc of quick coupler socket ISO
20
Seed pressure
Circuit pressure min.190 bar
–
max.230
Lifting and lowering circuit of the
preparation section
Circuit pressure min.190 bar
–
max.230
40 l/min., 2pcs of quick coupling
sockets ISO 12,5
Tractor air system requirement (if the
machine is equipped with brakes)
Machine axle braking circuit
Circuit pressure min.6 bar
– max. 15
bar
Tractor electrical system requirement
Connection of the electronic system of
the machine
12 V / 40 A
+ red
- black