GB
16
KJ 73-A
75036141 - KJ 73-A – rev 01 - ( 02-2021 )
f4
f5
f6
PLACING OF THE INSERT
(fig.
f4-f5-f6
)
Check that the threaded tie rod (
A
) and head (
B
) couple
assembled on the riveting tool is suitable to the size of the
insert to be used.
Adjust the stroke as indicated (fig.
f3
).
Introduce the insert on the tie rod (
A
) and push slightly on it
as indicated in figure
f4
, so as to make it clamp automatically
on the threaded tie rod. Make sure that the insert head
touches the head (
B
) checking that the tie rod (
A
) comes
out of
0.078"
from the insert.
In case of further adjustments of the tie rod (
A
) follow the
instructions of page 19.
It is now possible to place the insert pushing the button (
D
)
(
fig.f5-f7
) until the insert is completely pulled, and push
the button (
P
) to release the tie rod (fig.
f7
).
For a correct placing and right working of the machine, the
inserts to be used should be properly cleaned.
Note:
According to the desired clamping, carry out other
adjustments of the riveting tool stroke, rotating the knob
(
M
) (fig.
f3-f6
), if necessary.
Insufficient deformation =
the insert could rotate inside the
housing compromising its use and resistance.
Excessive deformation =
possible damages of the insert
and tie rod (
A
) with eventual breaks of both components.
B
A
D
M
0.078"