33
FaberFires.com
Unit Installation with Vertical Termination
!
rigidity for mounting the termination. See manufacturer's table cutout dimensions for appropriate sizing for component
used.
1.
used as noted above. Do not pack clearance space with
insulation. Consult the relevant section for the maximum
vertical rise of the venting system and the maximum
2. Set the gas appliance in its desired location. Drop a
plumb bob down from the ceiling to the position of
the vent will penetrate the ceiling. Drill a small hole
spot Diagram 2 where the vent will penetrate the roof.
will obstruct the venting system. You may wish to
bearing members.
3.
of every level.
4. Assemble the desired lengths of pipe and elbows.
Ensure that all pipes and elbow connections are in the
fully twist-locked position and sealed.
!
For best results and optimum performance with
to apply “Mill-Pac” sealant to every inner pipe connection.
Failure to do so may result in drafting or performance
issues not covered under warranty.
5. Cut a hole in the roof centered on the small drilled
hole placed in the roof in Step 2. The hole should be of
6. Continue to assemble pipe lengths.
!
for this purpose.
the chimney is installed. This allows for small
Diagram 1
Diagram 2
Framing
Fire Stop
Spacer
Diagram 3
Summary of Contents for FMG3326F-LP
Page 1: ......
Page 9: ...9 FaberFires com Maintenance Log Service Date Notes ...
Page 19: ...19 FaberFires com Remote Control Instructions ...
Page 20: ...20 ...
Page 21: ...21 FaberFires com ...
Page 22: ...22 ...
Page 23: ...23 FaberFires com ...
Page 38: ...38 ...
Page 70: ...70 Operation Inspection ...
Page 78: ......